Stochastic Scheduling to Minimize Expected Lateness in Multiple Identical Machines

نویسنده

  • Yasser Riaz Awan
چکیده

There are many real world problems in which parameters like the arrival time of new jobs, failure of resources, and completion time of jobs change continuously. This paper tackles the problem of scheduling jobs with random due dates on multiple identical machines in a stochastic environment. First to assign jobs to different machine centers LPT scheduling methods have been used, after that the particular sequence of jobs to be processed on the machine have been found using simple stochastic techniques. The performance parameter under consideration has been the maximum lateness concerning the stochastic due dates which are independent and exponentially distributed. At the end a relevant problem has been solved using the techniques in the paper.. Keywords—Quantity Production Flow Shop, LPT Scheduling, Stochastic Scheduling, Maximum Lateness, Random Due Dates

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing Maximum Lateness on Identical Parallel Batch Processing Machines

We consider the problem of scheduling n jobs with release dates on m identical parallel batch processing machines so as to minimize the maximum lateness. Each batch processing machine can process up to B (B < n) jobs simultaneously as a batch, and the processing time of a batch is the largest processing time among the jobs in the batch. Jobs processed in the same batch start and complete at the...

متن کامل

Scheduling Jobs with Stochastically Ordered Processing times on Parallel Machines to Minimize Expected Flowtime

A number of jobs are to be processed using a number of identical machines which operate in parallel. The processing times of the jobs are stochastic, but have known distributions which are stochastically ordered. A reward r(t) is acquired when a job is completed at time t. The function r(t) is assumed to be convex and decreasing in t. It is shown that within the class of non-preemptive scheduli...

متن کامل

Pii: S0360-8352(98)00105-3

ÐWe consider the problem of scheduling n identical jobs with unequal ready times on m parallel uniform machines to minimize the maximum lateness. This paper develops a branch-and-bound procedure that optimally solves the problem and introduces six simple single-pass heuristic procedures that approximate the optimal solution. The branch-and-bound procedure uses the heuristics to establish an ini...

متن کامل

A simulated annealing approach to minimize the maximum lateness on uniform parallel machines

This paper considers the uniform parallel machine scheduling problem which is to minimize the maximum lateness. This problem is equivalent to the uniform parallel machine scheduling problem, which is to minimize the maximal completion time of n jobs whose release times are zero, processing times depend on the speed of the machine to which they are assigned, and their delivery times are differen...

متن کامل

Is a Unit - Time Job Shop Not Easierthan

This paper gives the positive answer to the question posed in the title for a wide class of minimization criteria including the maximum completion time, maximum lateness , total completion time, total weighted completion time, total tardiness, total weighted tardiness, number of late jobs and the weighted number of late jobs. That is any scheduling problem for m identical parallel machines to m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010