An exploration into cost-influencing factors on construction projects
نویسنده
چکیده
Construction cost overrun is a common problem in construction industries. The objective of this research is to extract the key cost-influencing factors with new concept and methods to help control the expenditure. Hence, this research adopts the Modified Delphi Method (MDM) with 2 groups and 2 rounds and Kawakita Jiro method (KJ) to consolidate the experts' opinions and identify and rank the key factors that affect project costs. Ninety cost-influencing factors are collected from literary review and interviews with experts with practical cost control experiences in the construction companies (Group 1). The KJ method is used to consolidate these factors into 4 categories and down to a total of 42 factors. 2 rounds of questionnaires are then conducted to filter the key factors. In order to verify views of those in the first group, Group 2 consists of experienced experts from the public sectors, consulting firms and construction companies as a comparison. Results of the analysis indicate that there are 16 key cost-influencing factors. Severity Index computation was then adopted to rank these key cost-influencing factors. The study renders that clearly defined scope of project in the contract and cost control are the major determinants for cost overrun. © 2013 Elsevier Ltd. APM and IPMA. All rights reserved.
منابع مشابه
Assessment criteria and factors affecting the success of Public-Private Partnership (PPPs) in urban construction projects with an emphasis on Factor analysis and Pareto analysis
In the present study, criteria and factors affecting the success of public-private partnership in urban construction projects was examined relying on the combined method (analytical and correlation). In the method, based on the literature and document review and subsequent utilizes a field study (case study, interviews with experts and distributed questionnaires) was an attempt to explore the r...
متن کاملInvestigation of Significant Factors Influencing Time and Cost Overruns in Indian Construction Projects
Time overruns and Cost overruns has been a major issue in many Indian construction projects. The successful execution of construction projects and keeping them within prescribed schedule and cost is very important for effective time performance and cost performance. This research work is carried out on studying significant factors causing Time overruns and Cost overruns in Indian construction p...
متن کاملInvestigating the Impact of Safety Investment on Safety Culture in Construction Projects - Case Study of Power Plant Construction Projects
Background and aims: Construction industry is known as one of the most perilous industries in that it is involving the hazardous projects as well as the high manpower activities correlating with a high rate of work-related accidents. On the other hand, the high rate of accidents in the industry demanding a big budget for the damages; therefore, safety is strongly emphasized in the construction ...
متن کاملA cause and effect decision making model of factors influencing falling from height accidents in construction projects using Fuzzy-DEMATEL technique
Background and aims: All construction projects carry some levels of risk. The construction projects involve numerous uncertainties, multiple intricacies, varies techniques, and divergent environments. So that, workers in the construction industry are at greater risk because of the dynamic nature of the activities and momentous changes in working conditions in comparison with other industries. T...
متن کاملA Neural Network Model Based on Support Vector Machine for Conceptual Cost Estimation in Construction Projects
Estimation of the conceptual costs in construction projects can be regarded as an important issue in feasibility studies. This estimation has a major impact on the success of construction projects. Indeed, this estimation supports the required information that can be employed in cost management and budgeting of these projects. The purpose of this paper is to introduce an intelligent model to im...
متن کامل