A Model Used in Creating a Work-Rest Schedule for Laborers
نویسندگان
چکیده
This paper presents a mechanism in developing work-rest schedules for construction labors. Two objectives are balanced in the optimization processes. These objectives include minimizing the time for completing jobs as well as minimizing total extra energy that labors expend due to inappropriate work assignment which forces labors to working longer than maximum acceptable work duration. Experiments on examples demonstrate that the proposed mechanism effectively locates work-rest schedules.
منابع مشابه
Maintenance and work-rest scheduling in Human-machine system according to fatigue and reliability
Most manufacturers use human-machine systems to produce high-quality products. Dealing with human-machine systems is very complicated since not only machines should be utilized in proper condition but also appropriate environment should be provided for human resources. Most manufacturers have a maintenance plan for machines but many of them do not have a proper work-rest schedule for human reso...
متن کاملMaintenance and Work-rest Scheduling in Human-machine System According to Fatigue and Reliability
Most manufacturers use human-machine systems to produce high-quality products. Dealing with human-machine systems is very complicated since not only machines should be utilized in proper condition but also appropriate environment should be provided for human resources. Most manufacturers have a maintenance plan for machines but many of them do not have a proper work-rest schedule for human reso...
متن کاملBi-level Model for Reliability based Maintenance and Job Scheduling
Many defects in manufacturing system are caused by human resources that show the significance of the human resources in manufacturing systems. Most manufacturers attempt to investigate the human resources in order to improve the work conditions and reduce the human error by providing a proper work-rest schedule. On the other hand, manufacturer deal with machine scheduling based on demand and wo...
متن کاملHuman resources scheduling based on machines maintenance planning and human reliability level
In today's competitive market, quality has an important role in manufacturing system. The manufacturers attempt to maintain their production system in a proper condition to produce high quality products. One of the key factors to achieve this goal is maintenance policy. Most studies on maintenance focused on machines and less attention has been paid to human resources as the most important fact...
متن کاملبررسی پارامترهای مؤثر بر عدم توازن تلاش-پاداش و استرس شغلی ناشی از آن: نتایج پیمایش عوامل روان-اجتماعی در محیطهای کاری کشور ایران (IPWS)
Background and Objective: Effort-Reward Imbalance (ERI) model is one of the methods for studying occupational stress in the workplaces. Considering there has been no comprehensive study on the determining of effective individual and organizational parameters in Iran, the aim of this survey was to detect the parameters affecting perception of ERI in workers in the workplaces in Iran. Material...
متن کامل