A case study on the feasibility and performance of an UWB-AoA real time location system for resources management of civil construction projects
نویسندگان
چکیده
The application of integrated satellite and modern wireless positioning technologies for ubiquitous real-time resources management in large scale civil engineering projects can greatly optimize the time and cost in the construction process, and is now the trend for modern construction project management. As the outdoor conditions of most civil construction sites are open to sky, satellite positioning with the popularly used Global Positioning System (GPS) has been proved to be very e‰cient and e¤ective. However, the condition in indoor and underground construction site is very complicated due to the fact that di¤erent construction activities would be carried out in di¤erent congested areas, involving heavy construction plant, equipment, professionals and technical personnel. Nowadays di¤erent emerging technologies such as Wi-Fi and ZigBee can be adopted for position and tracking in indoor environments. Nevertheless, under the very complicated construction site conditions these technologies may fail due to movement of human resources and construction plant, variation of metrological conditions, and serious multipath e¤ects of signals. It is considered that Ultra Wide Band (UWB) technology is more suitable for indoor construction site environments. In this paper, a case study on the attempt of integrating GPS with Ubisense Realtime Location System (RTLS) for resources management in an underground railway construction site is discussed. Laboratory and field tests have shown that the RTLS can provide better resources management capability in terms of positioning accuracy and stability than Wi-Fi and ZigBee technologies under complicated construction environments. The test results show that the system can normally achieve better than 15 cm accuracy, and better than 1 m under adverse geometrical site condition. However, the high instrumental set up cost and the requirement for high quality data transmission cable for high precision time synchronization between sensors may deter wide application of similar system for resources management in construction sites.
منابع مشابه
OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING
During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...
متن کاملAn Appropriate Framework in the Area of Organization Knowledge Management of Civil Projects Using a Dynamic Model
The world economic image has been changing. It has been a long time since the sole important resources of an organization were financial and physical. In the newly-emerged global economy, knowledge and information are accounted as the most significant resources in order to produce value. Obviously, as the demand for knowledge to reach success is increasing day by day, maintenance and enhancemen...
متن کاملReducing rework and increasing the civil projects quality, through Total Quality Management (TQM), by using the concept of building information modeling (BIM)
One of the important problems in the field of Construction Industry is ‘rework’. It affects time, costs, quality, and almost every criteria of project success. As a result of rework and ineffective use of resources and materials in the workshops, there is always a considerable loss of resources, materials, investments, and workforce-time. Designing and planning through full awareness of clients...
متن کاملResilient Project Management, A New Approache to Develop Project Management Knowledge (Case Study: Infrastructure Civil Projects Management)
Accepetance of the fact that the working context of civil projects is challenging can enhance the resiliency capacity and will increase the project management concentration for improving and developing the software and hardware capabilities to facilitate project success achievement. This article is documented based on a research results in macro-hydropower plants projects management context to ...
متن کاملThe construction projects HSE performance evaluation considering the effect of external factors using Choquet integral, case study (an Iranian power plant construction company)
Nowadays, industrialization exposes the human and environment resources to serious dangers. The importance of these resources caused the HSE (health, safety and environment) to have a significant contribution in industries’ evaluation, especially in construction industry. While evaluating the project’s success from an HSE point of view, it is not enough to rely solely on the outputs without con...
متن کامل