Single-Machine Scheduling with Precedence Constraints

نویسندگان

  • José R. Correa
  • Andreas S. Schulz
چکیده

We discuss the problem of sequencing precedence-constrained jobs on a single machine to minimize the average weighted completion time. This problem has attracted much attention in the mathematical programming community since Sidney’s pioneering work in 1975 (Sidney, J. B. 1975. Decomposition algorithms for single machine scheduling with precedence relations and deferral costs. Operations Research 23 283–298). We look at the problem from a polyhedral perspective and uncover a relation between Sidney’s decomposition theorem and different linear programming relaxations. More specifically, we present a generalization of Sidney’s result, which particularly allows us to reason that virtually all known 2-approximation algorithms are consistent with his decomposition. Moreover, we establish a connection between the single-machine scheduling problem and the vertex cover problem. Indeed, in the special case of series-parallel precedence constraints, we prove that the sequencing problem can be seen as a special case of the vertex cover problem. We also argue that this result is true for general precedence constraints if one can show that a certain integer program represents a valid formulation of the sequencing problem. Finally, we give a 3/2-approximation algorithm for two-dimensional partial orders, and we also provide a characterization of the active inequalities of a linear programming relaxation in completion time variables.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs

This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...

متن کامل

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...

متن کامل

Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints

In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...

متن کامل

Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs

This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs and a mathematical model based on binary integer programming (BIP) is developed. Since the precedence constraints exist, a job cannot start before completion of its all predecessors. The proposed model consists of two steps: in the first step, the earliest starting time of each job is c...

متن کامل

A $(2 + \epsilon)$-approximation for precedence constrained single machine scheduling with release dates and total weighted completion time objective

We give a (2 + ǫ)-approximation algorithm for minimizing total weighted completion time on a single machine under release time and precedence constraints. This settles a recent conjecture made in [18]

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Math. Oper. Res.

دوره 30  شماره 

صفحات  -

تاریخ انتشار 2005