The New Bpm System and Its Commissioning at Pf Ring

نویسندگان

  • K. Haga
  • T. Honda
  • T. Kasuga
  • T. Obina
  • M. Tadano
چکیده

We describe the new beam position monitor (BPM) system built for the brilliance-upgraded Photon Factory storage ring. The new system was designed to enable precise and fast measurements to correct the closed orbit distortion (COD), as well as to feed back the orbit position during user-runs. There are 42 BPMs newly installed, amounting to a total of 65 BPMs. All of the newly installed BPMs are calibrated on the test bench using a coaxially strung metallic wire. The measured electrical offsets are typically 200 μm in both direction, which is 1/2 1/3 of those of the old-type BPM. In the signal-processing system, PIN diode switches are employed in order to improve the reliability. In the commissioning of the ring, new BPM system is capable of measuring COD within about 10 ms, and this fast acquisition will allow fast suppression of the vertical beam movement for frequencies up to 1 Hz using a fast global feedback system.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Experience with the Beam Position Monitor System of the Bessy Ii Storage Ring

The beam position monitor (BPM) system has been developed at BESSY and operates in 3 different modes: the closed orbit, the single turn, and the diagnostics mode. Details of the BPM system are presented together with the result of some bench tests. The commissioning of the system was done primarily with beam-based techniques and is described in more detail. First measurements of fast and slow b...

متن کامل

Commissioning and early experience with a new generation low-energy linear accelerator in zahedan

Introduction: Since commissioning beam data are treated as a reference and ultimately used by treatment planning systems, it is vitally important that the collected data are of the highest quality to avoid dosimetric and patient treatment errors that may subsequently lead to a poor radiation outcome. Beam data commissioning should be performed with appropriate knowledge and pr...

متن کامل

Commissioning of the Swiss Light Source

The Swiss Light Source (SLS) at the Paul Scherrer Institute (PSI) consists of a turn key 100 MeV linac, a novel type of booster synchrotron and a 12-TBA storage ring providing 5 nm·rad natural emittance at 2.4 GeV. The SLS project was approved by Swiss Government in Sept. 1997. By June 1999 the building was finished. Linac and booster commissioning concluded by April, resp. Sept. 2000. First be...

متن کامل

Performance of the Main Ring Bpm during the Beam Commissioning at J-parc

Experiences of operating BPM's during beam commissioning at the J-PARC MR are reported. The subjects are: (1) bug report, statistics and especially the effect of a beam duct step, (2) position resolution estimation, (3) test of beam based alignment.

متن کامل

Performance of the Beam Position Monitor System for the SLAC PEP-II B Factory

the beam position monitor (BPM) system for the SLAC PEP-II B Factory was designed to measure the positions of single-bunch single-turn to multibunch multi-turn beams in both rings of the facility. Each BPM is based on four button-style pickups. At most locations the buttons are connected to provide single-axis information (x only or y only). Operating at a harmonic (952 MHz) of the bunch spacin...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1998