A dynamic water accounting framework based on marginal resource opportunity cost
نویسندگان
چکیده
Many river basins throughout the world are increasingly under pressure as water demands keep rising due to population growth, industrialization, urbanization and rising living standards. In the past, the typical answer to meet those demands focused on the supply side and involved the construction of hydraulic infrastructures to capture more water from surface water bodies and from aquifers. As river basins have become more and more developed, downstream water users and ecosystems have become increasingly dependent on the management actions taken by upstream users. The increased interconnectedness between water users, aquatic ecosystems and the built environment is further compounded by climate change and its impact on the water cycle. Those pressures mean that it has become increasingly important to measure and account for changes in water fluxes and their corresponding economic value as they progress throughout the river system. Such basin water accounting should provide policy makers with important information regarding the relative contribution of each water user, infrastructure and management decision to the overall economic value of the river basin. This paper presents a dynamic water accounting approach whereby the entire river basin is considered as a value chain with multiple services including production and storage. Water users and reservoir operators are considered as economic agents who can exchange water with their hydraulic neighbors at a price corresponding to the marginal value of water. Effective water accounting is made possible by keeping track of all water fluxes and their corresponding hypothetical transactions using the results of a hydro-economic model. The proposed approach is illustrated with the Eastern Nile River basin in Africa.
منابع مشابه
Program Budgeting and Marginal Analysis (PBMA) A Method for Prioritizing Resources: A Review Article
Introduction: The optimal allocation of resources is based on the resource requirement of important functions of the health system. The aim of this study is to introduce marginal budget planning and marginal analysis as a new approach to allocating resources of health system resources. Methods: Using the Medline and Google Scholar databases and the PBMA keyword search, studies published in rele...
متن کاملIntegrated Assessment of Ferizi Watershed Based on Water Accounting Framework Using SWAT Model
Integrated assessment of the watershed is critical in arid and semi-arid areas due to the severe water stress in these regions. Data and information are an essential part of decision making and water governance to obtain integrated water resources management at the watershed scale. Water accounting is a helpful tool to organize information and present them as the standard indicators to achieve ...
متن کاملمدل سازی شوک های مارک آپ با استفاده از مدل DSGE (مورد ایران)
This paper investigates the effects of markup shocks of domestic and export goods prices on macroeconomic variables by using a Dynamic Stochastic General Equilibrium (DSGE) model for Iran, in order to examine the effect of the growth of market power and monopoly in domestic and exporting markets from a macroeconomic viewpoint. To this end, the optimal pricing process of domestic, importing and ...
متن کاملProposing a Human Resource Balanced Scorecard based on Dynamic Systems Simulation s-based
Objective: The purpose of this study is to provide a dynamic system model for modeling the growth and learning perspective of a manufacturing company. The main focus of the model is on the company's human resources management process. Methods: In this study, an approach based on dynamic simulation has been proposed to evaluate the human resource condition. In order to do that, the researchers...
متن کاملAN EFFECTIVE METHOD FOR SIMULTANEOUSLY CONSIDERING TIME-COST TRADE-OFF AND CONSTRAINT RESOURCE SCHEDULING USING NONLINEAR INTEGER FRAMEWORK
Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...
متن کامل