Performance Based Maintenance Scheduling for Building Service Components

نویسندگان

  • Karsten Menzel
  • Ena Tobin
  • Kenneth N. Brown
  • Mateo Burillo
چکیده

This paper discusses Performance Based Maintenance Scheduling as an enabler for Optimised Building Operation in terms of cost, energy usage, and user comfort, and the role of collaborative networks in achieving these optimal conditions. We finally explain what categories of constraints need to be considered to organize performance based maintenance scheduling in a holistic and integrated manner

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Anomaly detection for Building Service Components using performance data

The efficient operation of building systems is important energy efficiency, comfort and safety. Determining when maintenance is required or when a fault has occurred is the focus of this work. We show how to use available performance data in a methodology for improved maintenance scheduling through anomaly detection. We apply two statistical prognostic techniques – Particle Filters and Gaussian...

متن کامل

Bi-level Model for Reliability based Maintenance and Job Scheduling

Many defects in manufacturing system are caused by human resources that show the significance of the human resources in manufacturing systems. Most manufacturers attempt to investigate the human resources in order to improve the work conditions and reduce the human error by providing a proper work-rest schedule. On the other hand, manufacturer deal with machine scheduling based on demand and wo...

متن کامل

Reliability Based Maintenance and Human Resources Work-Rest Scheduling in Manufacturing System

In today's competitive market, all manufacturers attempt to improve their maintenance policy in order to decrease the cost of failure and increase the quality of products, but most of these attempts do not consider the role of humans involved in a manufacturing system. Human resources are the main factor in manufacturing that has an undeniable effect on products quality, machines reliability, s...

متن کامل

Maintenance and Work-rest Scheduling in Human-machine System According to Fatigue and Reliability

Most manufacturers use human-machine systems to produce high-quality products. Dealing with human-machine systems is very complicated since not only machines should be utilized in proper condition but also appropriate environment should be provided for human resources. Most manufacturers have a maintenance plan for machines but many of them do not have a proper work-rest schedule for human reso...

متن کامل

A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem

Traditional scheduling problems with the batch processing machines (BPM) assume that machines are continuously available, and no time is needed for their preventive maintenance (PM). In this paper, we study a realistic variant of flowshop scheduling which integrates flow shop batch processing machines (FBPM) and preventive maintenance for minimizing the makespan. In order to tackle the given pr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009