Modelling Practical Lot-Sizing Problems as Mixed-Integer Programs
نویسندگان
چکیده
In spite of the remarkable improvements in the quality of general purpose mixed-integer programming software, the effective solution of a variety of lot-sizing problems depends crucially on the development of tight formulations for the special problem features occurring in practice. After reviewing some of the basic preprocessing techniques for handling safety stocks and multilevel problems, we discuss a variety of aspects arising particularly in small and large bucket (time period) models such as start-ups, changeovers, minimum batch sizes, choice of one or two set-ups per period, etc. A set of applications is described that contains one or more of these special features, and some indicative computational results are presented. Finally, to show another technique that is useful, a slightly different (supply chain) application is presented, for which the a priori addition of some simple mixed-integer inequalities, based on aggregation, leads to important improvements in the results. (Lot-Sizing; Production Planning; Mixed-Integer Programming; Valid Inequalities; Reformulation)
منابع مشابه
OPTIMIZATION OF A PRODUCTION LOT SIZING PROBLEM WITH QUANTITY DISCOUNT
Dynamic lot sizing problem is one of the significant problem in industrial units and it has been considered by many researchers. Considering the quantity discount in purchasing cost is one of the important and practical assumptions in the field of inventory control models and it has been less focused in terms of stochastic version of dynamic lot sizing problem. In this paper, stochastic dyn...
متن کاملMIP models and exact methods for the Discrete Lot-sizing and Scheduling Problem with sequence-dependent changeover costs and times
Lot-sizing is one of the many issues arising in the context of production planning. Its main objective is to determine the timing and level of production so as to reach the best possible trade-off between minimizing setup and inventory holding costs and satisfying customer demand. When a limited production capacity and a deterministic time-varying demand rate are assumed, lot-sizing leads to th...
متن کاملExtended Model Formulation of the Proportional Lot-Sizing and Scheduling Problem with Lost Demand Costs
We consider mixed-integer linear programming (MIP) models of production planning problems known as the small bucket lot-sizing and scheduling problems. We present an application of a class of valid inequalities to the case with lost demand (stock-out) costs. Presented results of numerical experiments made for the the Proportional Lot-sizing and Scheduling Problem (PLSP) confirm benefits of such...
متن کاملOn the Capacitated Lot Sizing and Continuous Knapsack Polyhedra
We consider the single item capacitated lot sizing problem a well known produc tion planning model that often arises in practical applications and derive new classes of valid inequalities for it We also derive new easily computable valid inequalities for the continuous knapsack problem The continuous knapsack problem has been introduced recently and has been shown to provide a useful relaxation...
متن کاملModelling and Scheduling Lot Streaming Flexible Flow Lines
Although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. This paper deals with scheduling jobs in lot streaming flexible flow line problems. The paper mathematically formulates the problem by a mixed integer linear programming model. This model solves small instances to optimality. Moreo...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Management Science
دوره 47 شماره
صفحات -
تاریخ انتشار 2001