3 This paper presents a case study of successful ERP implementation in two phases. The second phase included significant efforts to align the business strategy and organizational structure along with the information system components. These efforts enabled the organization to complete its alignment cycle by integrating its IT infrastructure and processes with the organizational infrastructure and processes, as well as fitting business strategy with the new infrastructure and processes and to reap the maximum value.
منابع مشابه
Project Portfolio Selection with the Maximization of Net Present Value
Projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. An integer programming model is formulated for the project portfolio selection and scheduling.Two heuristic algorithms, genetic algorithm (GA) and simulated annealing (SA), are presented to solve the problem. Results of cal...
متن کاملProject scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study
Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...
متن کاملProject resource investment problem under progress payment model
As a general branch of project scheduling problems, resource investment problem (RIP) considers resource availabilities as decision variables to determine a level of employed resources minimizing the costs of the project. In addition to costs (cash outflows), researchers in the later extensions of the RIP took payments (cash inflows) received from clients into account and used the net present v...
متن کاملProject portfolio selection: Multi-criteria analysis and interactions between projects
In the project portfolio management, the project selection phase presents the greatest interest. In this article, we focus on this important phase by proposing a new method of projects selection consisting of several steps. We propose as a first step, a classification of projects based on the three most important criteria namely the value maximization, risk minimization and strategic alignment....
متن کاملA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...