Automated Processing of Subcontractor Work Performance Data to Improve the Quality Control and Support the Subcontractor Selection Process

نویسنده

  • Tatjana Vilutienė
چکیده

The paper presents the research aimed to find the way for efficient monitoring and control of subcontractor performance in large construction projects. As a result the procedure for recording and processing the nonconformities is proposed. Procedure consists of the following stages: the identification of nonconformity (defect, work performed is at variance with project, the requirements of work or environment safety are violated, etc.); construction manager or engineer fills the nonconformity report for subcontractor; engineer puts the information about the nonconformity in the register were it is automatically processing and visualizing in form of tables and diagrams. For processing the data the classifier of nonconformities for register was proposed. According to classifier the nonconformities are sorting by the following attributes: 1) nonconformity to quality requirements; 2) nonconformity to requirements of work safety; 3) nonconformity to requirements of environment safety. Each of these groups has the subgroups for classifying, which let to gain the more precise information about the nature of nonconformity. Information of register is regular, up to date and useful for different company activities involved in construction process. For example, procurement department could use this information in subcontractor prequalification and selection process for further construction projects, construction managers could organize the monitoring of subcontractors works more effectively, for the information in register gives the awareness of how frequently and what kind of nonconformities are usually done by subcontractors.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Design of An Integrated Robust Optimization Model for Closed-Loop Supply Chain and supplier and remanufacturing subcontractor selection

The development of optimization and mathematical models for closed loop supply chain (CLSC) design has attracted considerable interest over the past decades. However, the uncertainties that are inherent in the network design are challenging the capabilities of the developed tools. In CLSC Uncertainty in demand is major source of uncertainty. The aim of this paper, therefore, is to present a Rob...

متن کامل

Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints

In this paper, we focus on outsourcing activities optimization problem in single period setting. In some situations, capacity planning or outsourcing is a one-time event and can be modeled as a single period problem. The aim of this research is to balance the trade-off between two echelons of a supply chain consisting of a single outsourcer and a single subcontractor. Each part is composed of a...

متن کامل

Predicting Subcontractor Performance Using Web-Based Evolutionary Fuzzy Neural Networks

Subcontractor performance directly affects project success. The use of inappropriate subcontractors may result in individual work delays, cost overruns, and quality defects throughout the project. This study develops web-based Evolutionary Fuzzy Neural Networks (EFNNs) to predict subcontractor performance. EFNNs are a fusion of Genetic Algorithms (GAs), Fuzzy Logic (FL), and Neural Networks (NN...

متن کامل

An On-site subcontractor evaluation method based on lean principles and partnering practices

Subcontracting has greatly increased in the construction industry. It helps shift risk from the main contractor to the subcontractor and promotes specialization. Inadequate subcontracting management, however, may result in an adversarial relationship between main contractors and their subcontractors, uncoordinated on-site execution, and disappointing quality and schedule fulfillment. New subcon...

متن کامل

Improved Construction Subcontractor Evaluation Performance Using ESIM

This article may be used for research, teaching, and private study purposes. Any substantial or systematic reproduction, redistribution, reselling, loan, sub-licensing, systematic supply, or distribution in any form to anyone is expressly forbidden. The publisher does not give any warranty express or implied or make any representation that the contents will be complete or accurate or up to date...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008