On the interaction between maintenance, spare part inventories and repair capacity for a k
نویسندگان
چکیده
In this paper we consider a k-out-of-N system with identical, repairable components under a condition-based maintenance policy. Maintenance consists of replacing all failed and/or aged components. Next, the replaced components have to be repaired. The system availability can be controlled by the maintenance policy, the spare part inventory level, the repair capacity and repair job priority setting. We present two approximate methods to analyse the relation between these control variables and the system availability. Comparison with simulation results shows that we can generate accurate approximations using one of these models, depending on the system size. 2005 Elsevier B.V. All rights reserved.
منابع مشابه
On the availability of a k-out-of-N system given limited spares and repair capacity under a condition based maintenance strategy
This paper considers a k-out-of-N system with identical, repairable components. Maintenance is initiated when the number of failed components exceeds some critical level. After a possible set-up time, all failed components are replaced by spares. A multi-server repair shop repairs the failed components. The system availability depends on the spare part stock level, the maintenance policy and th...
متن کاملTwo echelon-two indenture extended warranty distribution network under imperfect preventive maintenance policies
Nowadays, offering extended warranty is considered as a lucrative source of income from the perspective of the after-sale service providers. Meanwhile, the main concern is presence or absence of base warranty and strategies adopted by the manufacturer during this period. Moreover, extended warranty structure must be responsive and customer oriented, which not only control the services cost but ...
متن کاملInventory reduction in spare part networks by selective throughput time reduction
We consider combined inventory control and throughput time reduction in multi-echelon, multiindenture spare part networks for system upkeep of capital goods. We construct a model in which standard throughput times (TPT) for repair and transportation can be reduced at additional costs. We first estimate the marginal impact of TPT reduction on the system availability. Next, we develop an optimiza...
متن کاملClosed-loop Supply Chain Inventory-location Problem with Spare Parts in a Multi-Modal Repair Condition
In this paper, a closed-loop location-inventory problem for spare parts is presented. The proposed supply chain network includes two echelons, namely (1) distribution centers (DCs) and repairing centers (RCs) and (2) operational bases. Multiple spare parts are distributed among operational bases from distribution centers in the forward supply chain and failed spare parts from operational bases ...
متن کاملIntegrated service engineers and spare parts planning in the maintenance Logistics
We analyze the integrated tactical capacity planning of spare parts supply and workforce allocation in maintenance logistics of advanced equipment. The equipment time-to-failure, spare parts replenishment time, and equipment repair time are random and independent of each other.
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- European Journal of Operational Research
دوره 174 شماره
صفحات -
تاریخ انتشار 2006