On the interaction between maintenance, spare part inventories and repair capacity for a k

نویسندگان

  • Karin S. de Smidt-Destombes
  • Matthieu van der Heijden
  • Aart van Harten
چکیده

In this paper we consider a k-out-of-N system with identical, repairable components under a condition-based maintenance policy. Maintenance consists of replacing all failed and/or aged components. Next, the replaced components have to be repaired. The system availability can be controlled by the maintenance policy, the spare part inventory level, the repair capacity and repair job priority setting. We present two approximate methods to analyse the relation between these control variables and the system availability. Comparison with simulation results shows that we can generate accurate approximations using one of these models, depending on the system size. 2005 Elsevier B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

On the availability of a k-out-of-N system given limited spares and repair capacity under a condition based maintenance strategy

This paper considers a k-out-of-N system with identical, repairable components. Maintenance is initiated when the number of failed components exceeds some critical level. After a possible set-up time, all failed components are replaced by spares. A multi-server repair shop repairs the failed components. The system availability depends on the spare part stock level, the maintenance policy and th...

متن کامل

Two echelon-two indenture extended warranty distribution network under imperfect preventive maintenance policies

Nowadays, offering extended warranty is considered as a lucrative source of income from the perspective of the after-sale service providers. Meanwhile, the main concern is presence or absence of base warranty and strategies adopted by the manufacturer during this period. Moreover, extended warranty structure must be responsive and customer oriented, which not only control the services cost but ...

متن کامل

Inventory reduction in spare part networks by selective throughput time reduction

We consider combined inventory control and throughput time reduction in multi-echelon, multiindenture spare part networks for system upkeep of capital goods. We construct a model in which standard throughput times (TPT) for repair and transportation can be reduced at additional costs. We first estimate the marginal impact of TPT reduction on the system availability. Next, we develop an optimiza...

متن کامل

Closed-loop Supply Chain Inventory-location Problem with Spare Parts in a Multi-Modal Repair Condition

In this paper, a closed-loop location-inventory problem for spare parts is presented. The proposed supply chain network includes two echelons, namely (1) distribution centers (DCs) and repairing centers (RCs) and (2) operational bases. Multiple spare parts are distributed among operational bases from distribution centers in the forward supply chain and failed spare parts from operational bases ...

متن کامل

Integrated service engineers and spare parts planning in the maintenance Logistics

We analyze the integrated tactical capacity planning of spare parts supply and workforce allocation in maintenance logistics of advanced equipment. The equipment time-to-failure, spare parts replenishment time, and equipment repair time are random and independent of each other.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 174  شماره 

صفحات  -

تاریخ انتشار 2006