The Impact of Nonagility on Service Level and Project Duration

نویسندگان

  • Karolina J. Glowacka
  • Timothy J. Lowe
  • Richard E. Wendell
چکیده

Why projects are late” is a fundamental issue in theory and in practice. One well established explanation is that a project’s network structure can be a significant factor—the “fatter” or more parallel the project, the later the project completion. Herein we show that a lack of agility, which may frequently arise in projects when there are external resources, can also be a significant factor in project delays—both in more serial-like projects as well as more parallel ones. Specifically, this paper formally characterizes the concept of agility in projects, shows how a lack of agility can have a significant impact on a project, and gives some general properties on agility with respect to a project’s structure. 1 This paper is co-authored with Professors Karolina J. Glowacka (Hang Seng Management College, Hong Kong) and Timothy J. Lowe (Tippie College of Business, University of Iowa). It was published in Decision Sciences, Volume 43, Number 5, October 2012.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Impact of Service on Customers’ Demand and Members’ Profit in Supply Chain

This paper investigates the impact of provided service by the retailers and manufacturers on customers’ demand and members’ profit in a supply chain. It focuses on a supply chain structure with one manufacturer and a common retailer. The demand of customers depends on retailer price and service level. A game-theoretic framework is applied to obtain the equilibrium solutions for each entity in s...

متن کامل

The Impact of Fuel Subsidy Targeting in Iran Using a CGE Model

Despite the implementation of the first phase of fuel subsidy targeting in December 2010, there are still debates over the economic impact of this project in Iran. A CGE model is used to analyze the impact of fuel subsidy targeting in Iran in four different scenarios. The data are used in the framework of SAM for the year 2001. In all scenarios, indirect subsidies are removed completely and rep...

متن کامل

Analysis the Impact of In-Service Education on Professional Development of Employers, by Using Solomon Four Group Design, in Agro-Industry Company

In-service education programs have provided the professional development level of companies' employers, in the high quality form. The applying of in-service education programs has been a key component of professional development process for staff agro-industry Company. The study is utilized experimental Solomon four group designs to determine the impact of in-service education programs on agro-...

متن کامل

Evaluation of Quantitative Impact of Watershed Management Projects on Underground water Level (Case Study: Jamab Project)

Performance and control are two important components in any executive activity and their purposes are to correct and improve the functions and reduce wasting resources for better productivity and adoption of appropriate techniques that ultimately lead to the development of programs. Therefore, the present study aimed to simulate underground water flow and investigate the effects of artificial ...

متن کامل

A Systems Dynamics Model for Project Management systems of Project-Based Organization

It is obvious that the success of a project-based organization is dependent on its projects. A variety of tools such as the project excellence model, project management maturity models, the earned value method, have been developed in this regard, but there are still delays in projects because the projects have dynamic nature with non-linear relationships and feedback processes during the projec...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Decision Sciences

دوره 43  شماره 

صفحات  -

تاریخ انتشار 2012