The Optimal Development of Resource Pools
نویسنده
چکیده
منابع مشابه
OPTIMAL RESOURCE ALLOCATION IN DEA WITH INTEGER VARIABLES
Resource allocation and optimal leveling are among the top challenges in project management. This paper presents a DEA-based procedure for determining an optimal level of inputs to produce a fixed level of outputs. To achieve this goal, we assume that the levels of outputs can be forecasted in the next season and the procedure will determine optimal level of inputs for all DMUs. Such as some of...
متن کاملParallel Computing in Optimal Design of Development of Multilayer Oil and Gas Fields
In this paper we consider problems of optimization and selection of development systems (technologies) of oil/gas fields, consisting of some disjoint oil/gas pools (in terms of hydrodynamics), tied by resource constraints or general oil/gas production plan. In order to solve these problems, formulated as MILP models, we have developed approximate algorithm using Lagrangian relaxation (see Mikha...
متن کاملBicriteria Resource Allocation Problem in Pert Networks
We develop a bicriteria model for the resource allocation problem in PERT networks, in which the total direct costs of the project as the first objective, and the mean of project completion time as the second objective are minimized. The activity durations are assumed to be independent random variables with either exponential or Erlang distributions, in which the mean of each activity duration ...
متن کاملSensitivity Analysis Based Comparative Assessment of Resource Mix Using MCDM Technique: A Case Study of Thar Desert, India
In the last decade, there has been a lot of focus on sustainable development in the electrical power industry to meet the growing energy demand. This has led to an increase in the integration of renewable energy sources (RES). In addition to being abundantly available, the RES offers advantages such as low environmental impact and increased social development of rural communities which are impe...
متن کاملAn Optimal NPV Project Scheduling with Fixed Work Content and Payment on Milestones
Project scheduling Net present value We consider a project scheduling problem with permitted tardiness and discrete time/resource trade-offs under maximum net present value objective. In this problem, a project consists of a set of sequential phases such that each phase contains one or more sub-projects including activities interrelated by finish-start-type precedence relations with a t...