Optimal Coordination Mechanisms for Multi-job Scheduling Games

نویسندگان

  • Fidaa Abed
  • José R. Correa
  • Chien-Chung Huang
چکیده

We consider the unrelated machine scheduling game in which players control subsets of jobs. Each player’s objective is to minimize the weighted sum of completion time of her jobs, while the social cost is the sum of players’ costs. The goal is to design simple processing policies in the machines with small coordination ratio, i.e., the implied equilibria are within a small factor of the optimal schedule. We work with a weaker equilibrium concept that includes that of Nash. We first prove that if machines order jobs according to their processing time to weight ratio, a.k.a. Smith-rule, then the coordination ratio is at most 4, moreover this is best possible among nonpreemptive policies. Then we establish our main result. We design a preemptive policy, externality, that extends Smith-rule by adding extra delays on the jobs accounting for the negative externality they impose on other players. For this policy we prove that the coordination ratio is 1 +φ ≈ 2.618, and complement this result by proving that this ratio is best possible even if we allow for randomization or full information. Finally, we establish that this externality policy induces a potential game and that an ε-equilibrium can be found in polynomial time. An interesting consequence of our results is that an ε−local optima of R| | ∑ wjCj for the jump (a.k.a. move) neighborhood can be found in polynomial time and are within a factor of 2.618 of the optimal solution. The latter constitutes the first direct application of purely game-theoretic ideas to the analysis of a well studied local search heuristic.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Coordination Mechanisms for Selfish Scheduling

In machine scheduling, a set of n jobs must be scheduled on a set of m machines. Each job i incurs a processing time of pij on machine j and the goal is to schedule jobs so as to minimize some global objective function, such as the maximum makespan of the schedule considered in this paper. Often in practice, each job is controlled by an independent selfish agent who chooses to schedule his job ...

متن کامل

Economically Coordinated Job Shop Scheduling and Decision Point Bidding - An Example for Economic Coordination in Manufacturing and Logistics

We discuss the application of economic coordination mechanisms to scheduling problems in manufacturing and logistics. We use job shop scheduling as a sample problem domain. We study economically augmented job shop problems (EJSP) which comprise valuation information. We demonstrate how instances of EJSP can be mapped to combinatorial job shop auction problems (CJSAP). A discussion of the tracta...

متن کامل

An algorithm for multi-objective job shop scheduling problem

Scheduling for job shop is very important in both fields of production management and combinatorial op-timization. However, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. The combination of several optimization criteria induces additional complexity and new problems. In this paper, we pro...

متن کامل

Multiagent coordination for Multiple Resource Job Scheduling

Efficient management of large-scale job processing systems is a challenging problem, particularly in the presence of multiusers and dynamically changing system conditions. In addition, many real world systems require the processing of multi-resource jobs where centralized coordination may be difficult. Most conventional algorithms, such as load balancing, are designed for centralized, single re...

متن کامل

Solving Flexible Job Shop Scheduling with Multi Objective Approach

  In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Pareto-optima...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014