On Minimizing the Makespan When Some Jobs Cannot Be Assigned on the Same Machine

نویسندگان

  • Syamantak Das
  • Andreas Wiese
چکیده

We study the classical scheduling problem of assigning jobs to machines in order to minimize the makespan. It is well-studied and admits an EPTAS on identical machines and a (2− 1/m)approximation algorithm on unrelated machines. In this paper we study a variation in which the input jobs are partitioned into bags and no two jobs from the same bag are allowed to be assigned on the same machine. Such a constraint can easily arise, e.g., due to system stability and redundancy considerations. Unfortunately, as we demonstrate in this paper, the techniques of the above results break down in the presence of these additional constraints. Our first result is a PTAS for the case of identical machines. It enhances the methods from the known (E)PTASs by a finer classification of the input jobs and careful argumentations why a good schedule exists after enumerating over the large jobs. For unrelated machines, we prove that there can be no (logn)1/4− -approximation algorithm for the problem for any > 0, assuming that NP * ZPTIME(2(logn) ). This holds even in the restricted assignment setting. However, we identify a special case of the latter in which we can do better: if the same set of machines we give an 8-approximation algorithm. It is based on rounding the LP-relaxation of the problem in phases and adjusting the residual fractional solution after each phase to order to respect the bag constraints. 1998 ACM Subject Classification F.2.2 Nonnumerical Algorithms and Problems

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop

[if gte mso 9]> The purpose of this paper is to consider the problem of scheduling a set of start time-dependent jobs in a two-machine flow shop, in which the actual processing times of jobs increase linearly according to their starting time. The objective of this problem is to minimize the makespan. The problem is known to be NP-hardness[ah1] ; therefore, there is no polynomial-time algorithm...

متن کامل

Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times

This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...

متن کامل

Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times

The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...

متن کامل

Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times

We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...

متن کامل

Minimizing a General Penalty Function on a Single Machine via Developing Approximation Algorithms and FPTASs

This paper addresses the Tardy/Lost penalty minimization on a single machine. According to this penalty criterion, if the tardiness of a job exceeds a predefined value, the job will be lost and penalized by a fixed value. Besides its application in real world problems, Tardy/Lost measure is a general form for popular objective functions like weighted tardiness, late work and tardiness with reje...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017