Analyzing the quality of the expected value solution in stochastic programming
نویسندگان
چکیده
Stochastic programs are usually hard to solve when applied to real-world problems; a common approach is to consider the simpler deterministic program in which random parameters are replaced by their expected values, with a loss in terms of quality of the solution. The Value of the Stochastic Solution—VSS—is normally used to measure the importance of using a stochastic model. But what if VSS is large, or expected to be large, but we cannot solve the relevant stochastic program? Shall we just give up? In this paper we investigate very simple methods for studying structural similarities and differences between the stochastic solution and its deterministic counterpart. The aim of the methods is to find out, even when VSS is large, if the deterministic solution carries useful information for the stochastic case. It turns out that a large VSS does not necessarily imply that the deterministic solution is useless for the stochastic setting. Measures of the structure and upgradeability of the deterministic solution such as the loss using the skeleton solution and the loss of upgrading the deterministic solution will be introduced and basic inequalities in relation to the standard VSS are presented and tested on different cases.
منابع مشابه
Optimization Model of Hirmand River Basin Water Resources in the Agricultural Sector Using Stochastic Dynamic Programming under Uncertainty Conditions
In this study, water management allocated to the agricultural sector’ was analyzed using stochastic dynamic programming under uncertainty conditions. The technical coefficients used in the study referred to the agricultural years, 2013-2014. They were obtained through the use of simple random sampling of 250 farmers in the region for crops wheat, barley, melon, watermelon and ruby grapes under ...
متن کاملRobust inter and intra-cell layouts design model dealing with stochastic dynamic problems
In this paper, a novel quadratic assignment-based mathematical model is developed for concurrent design of robust inter and intra-cell layouts in dynamic stochastic environments of manufacturing systems. In the proposed model, in addition to considering time value of money, the product demands are presumed to be dependent normally distributed random variables with known expectation, variance, a...
متن کاملDemand-oriented timetable design for urban rail transit under stochastic demand
In the context of public transportation system, improving the service quality and robustness through minimizing the average passengers waiting time is a real challenge. This study provides robust stochastic programming models for train timetabling problem in urban rail transit systems. The objective is minimization of the weighted summation of the expected cost of passenger waiting time, its va...
متن کاملExpected Duration of Dynamic Markov PERT Networks
Abstract : In this paper , we apply the stochastic dynamic programming to approximate the mean project completion time in dynamic Markov PERT networks. It is assumed that the activity durations are independent random variables with exponential distributions, but some social and economical problems influence the mean of activity durations. It is also assumed that the social problems evolve in ac...
متن کاملA Two Stage Stochastic Programming Model of the Price Decision Problem in the Dual-channel Closed-loop Supply Chain
In this paper, we propose a new model for designing integrated forward/reverse logistics based on pricing policy in direct and indirect sales channel. The proposed model includes producers, disposal center, distributers and final customers. We assumed that the location of final customers is fixed. First, a deterministic mixed integer linear programming model is developed for integrated logistic...
متن کاملA multi-stage stochastic programming for condition-based maintenance with proportional hazards model
Condition-Based Maintenance (CBM) optimization using Proportional Hazards Model (PHM) is a kind of maintenance optimization problem in which inspections of a system relevant to its failure rate depending on the age and value of covariates are performed in time intervals. The general approach for constructing a CBM based on PHM for a system is to minimize a long run average cost per unit of time...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Annals OR
دوره 200 شماره
صفحات -
تاریخ انتشار 2012