Term Structure Models in Multistage Stochastic Programming: Estimation and Approximation
نویسندگان
چکیده
This paper investigates some common interest rate models for scenario generation in financial applications of stochastic optimization. We discuss conditions for the underlying distributions of state variables which preserve convexity of value functions in a multistage stochastic program. Oneand multi-factor term structure models are estimated based on historical data for the Swiss Franc. An analysis of the dynamic behavior of interest rates generated with these models reveals several deficiencies which have an impact on the performance of investment policies derived from the stochastic program. While barycentric approximation is used here for the generation of scenario trees, these insights may be generalized to other discretization techniques as well.
منابع مشابه
Medium Term Hydroelectric Production Planning - A Multistage Stochastic Optimization Model
Multistage stochastic programming is a key technology for making decisions over time in an uncertain environment. One of the promising areas in which this technology is implementable, is medium term planning of electricity production and trading where decision makers are typically faced with uncertain parameters (such as future demands and market prices) that can be described by stochastic proc...
متن کاملA Multistage Linear Stochastic Programming Model for Optimal Corporate Debt Management
Large corporations fund their capital and operational expenses by issuing bonds with a variety of indexations, denominations, maturities and amortization schedules. We propose a multistage linear stochastic programming model that optimizes the bond issuance policy to fund a predetermined project portfolio. Cash flows are uncertain, affected by financial, macroeconomic and business specific risk...
متن کاملEnergy Scheduling in Power Market under Stochastic Dependence Structure
Since the emergence of power market, the target of power generating utilities has mainly switched from cost minimization to revenue maximization. They dispatch their power energy generation units in the uncertain environment of power market. As a result, multi-stage stochastic programming has been applied widely by many power generating agents as a suitable tool for dealing with self-scheduling...
متن کاملA Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning
The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...
متن کاملA Defined Benefit Pension Fund ALM Model through Multistage Stochastic Programming
We consider an asset-liability management (ALM) problem for a defined benefit pension fund (PF). The PF manager is assumed to follow a maximal fund valuation problem facing an extended set of risk factors: due to the longevity of the PF members, the inflation affecting salaries in real terms and future incomes, interest rates and market factors affecting jointly the PF liability and asset p...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Annals OR
دوره 100 شماره
صفحات -
تاریخ انتشار 2000