Effective Continuous-Time Formulation for Short-Term Scheduling. 3. Multiple Intermediate Due Dates1,2
نویسنده
چکیده
The problem of short-term scheduling often involves the satisfaction of variable product demands at specific due dates within the time horizon under consideration. Ierapetritou and Floudas (Ind. Eng. Chem. Res. 1998, 37, 4341-4359, 4360-4374) presented a new continuous time formulation to effectively address the problem of short-term scheduling in batch, continuous, and mixed production facilities where product demands are specified at the end of the time horizon. The primary objective of this paper is to extend the continuous-time formulation so as to deal with intermediate due dates. The mathematical model is developed and the operation mode of the plant (batch or semicontinuous) is further exploited to result in the most efficient solution strategy. Several examples are provided to illustrate the capabilities of the proposed continuous-time formulations, and it is demonstrated that a variety of problems presented in the literature can be addressed efficiently.
منابع مشابه
An Improved Continuous-time Formulation for Short-term Scheduling with Resource Constraints
An enhanced continuous-time formulation is presented for the short-term scheduling of multipurpose batch plants with intermediate due dates and a variety of resource constraints. The proposed formulation is based on the continuous-time formulation presented by Ierapetritou and Floudas (1998) and incorporates several features that include: (i) various storage policies (UIS, FIS, NIS, ZW), (ii) r...
متن کاملEnhanced Continuous-Time Unit-Specific Event-Based Formulation for Short-Term Scheduling of Multipurpose Batch Processes: Resource Constraints and Mixed Storage Policies
An enhanced continuous-time formulation is presented for the short-term scheduling of multipurpose batch plants with intermediate due dates. The proposed formulation is based on the continuous-time formulation introduced by Ierapetritou and Floudas (Ind. Eng. Chem. Res. 1998, 37, 4341 and 4360) and incorporates and elaborates on several features that include (i) various storage policies (UIS, F...
متن کاملA New Continuous-time MILP Model for the Short- Term Scheduling of Multi Stage Batch Plants
This paper presents a new multiple time grid continuous time MILP model for the short-term scheduling of multistage, multiproduct plants. It can handle both release and due dates and different objective functions efficiently, such as the minimization of total cost, total earliness or makespan. This formulation is compared to other existing mixed-integer linear programming approaches and to a co...
متن کاملShort-term Scheduling of Batch Plants with Multiple Intermediate Due Dates
The problem of short-term scheduling often involves the satisfaction of variable product demands at specific due dates within the time horizon under consideration. Ierapetritou and Floudas, [2, 3] presented a novel continuous time formulation to effectively address the problem of short-term scheduling in batch, continuous and mixed production facilities where product demands are specified at th...
متن کاملScheduling of Multiple Autonomous Guided Vehicles for an Assembly Line Using Minimum Cost Network Flow
This paper proposed a parallel automated assembly line system to produce multiple products having multiple autonomous guided vehicles (AGVs). Several assembly lines are configured to produce multiple products in which the technologies of machines are shared among the assembly lines when required. The transportation between the stations in an assembly line (intra assembly line) and among station...
متن کامل