The two level master production schedule and planning bills in a just in time MRP context
نویسندگان
چکیده
The evolution of industrial "rms has recently passed from a strong growth phase to a phase where there is a greater complexi"cation of products: widening the range of products in catalogues, diversi"cation and personalization of models. The current trend is to use, with production management techniques such as classical manufacturing resource planning (MRP2), the concept of two level master production schedule (MPS), using planning bills with percentages indicating the probability that such or such an option will be used. This necessitates, however, the implementation of a rigorous approach to continuous improvement using just in time (JiT) and total quality (TQ) concepts. In the "rst part of our paper we discuss principles of operating two level MPS; secondly, we analyze these e!ects on management and organization. Our paper is based on a case study. ( 2000 Elsevier Science B.V. All rights reserved.
منابع مشابه
How to Use MRP in Continuous Production Industries When Order Type is Lot for Lot
The Materials Requirements Planning (MRP) method that is applied in production planning and management has some weaknesses. One of its weaknesses is that the time in MRP method is discrete, and is considered as time period. Hence we are not able to order our requirements at irregular time moments or periods. In this paper, a new form of MRP is introduced that is named Continuous Materials Requi...
متن کاملAnalysis of lumpiness phenomenon in MRP
Occurrence of chaotic behaviors because of fluctuations creation and their intensified transfer along the chain is one of the main causes of inefficiency of Material Requirements Planning (MRP) based supply chains. One of the reasons of the inefficiency is the lumpiness phenomenon. Through this phenomenon, some parts have an irregular production schedule, with nothing produced in some periods a...
متن کاملStrategic Choice of Manufacturing Planning and Control Approaches: Empirical Analysis of Drivers and Performance
The design of manufacturing planning and control systems is a strategic decision for manufacturing firms. In this paper we analyze the interrelationships among the choices of planning and control approaches at different hierarchical levels, including sales and operations planning (chase; level), master scheduling (make-to-order; assemble-to-order; make-to-stock), material planning (time-phased;...
متن کاملMrp-jit Integrated Production System
A combined MRP(material requirement planning) and JIT(just in time) system can be more effective manufacturing system which utilizes the best attributes of each manufacturing system need to accommodate the best planning features of MRP and the best execution features of JIT to address the changing needs of industry. When MRP and JIT involve in any production system than its balance the all enti...
متن کاملEnterprise Resource Planning and Integration
Enterprise resource planning (ERP) is a state-of-the-art approach to running organizations with the help of comprehensive information systems, providing support for key business processes and more general, for electronic business (e-business). ERP has evolved from earlier approaches, in particular, materials requirement planning (MRP) and manufacturing resource planning (called MRP II) in the 1...
متن کامل