A particle swarm optimization based hyper-heuristic algorithm for the classic resource constrained project scheduling problem
نویسندگان
چکیده
In this paper, we propose a particle swarm optimization (PSO) based hyper-heuristic algorithm for solving the resource constrained project scheduling problem (RCPSP). To the best of our knowledge, this is the first attempt to develop a PSO hyper-heuristic and apply to the classic RCPSP. The hyper-heuristic works as an upper-level algorithm that controls several low-level heuristics which operate to the solution space. The solution representation is based on random keys. Active schedules are constructed by the serial scheduling generation scheme using the priorities of the activities which are modified by the low-level heuristics of the algorithm. Also, the double justification operator, i.e. a forward–backward improvement procedure, is applied to all solutions. The proposed approach was tested on a set of standard problem instances of the well-known library PSPLIB and compared with other approaches from the literature. The promising computational results validate the effectiveness of the proposed approach. 2014 Elsevier Inc. All rights reserved.
منابع مشابه
Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)
Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...
متن کاملDetecting communities of workforces for the multi-skill resource-constrained project scheduling problem: A dandelion solution approach
This paper proposes a new mixed-integer model for the multi-skill resource-constrained project scheduling problem (MSRCPSP). The interactions between workers are represented as undirected networks. Therefore, for each required skill, an undirected network is formed which shows the relations of human resources. In this paper, community detection in networks is used to find the most compatible wo...
متن کاملA Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملA Bi-objective Pre-emption Multi-mode Resource Constrained Project Scheduling Problem with due Dates in the Activities
In this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. Although optimization of bi-objective problems with due dates is an essential feature of real projects, little effort has been made in studying the P-MMRCPSP while due dates are included i...
متن کاملProject Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources
Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...