Two agents single machine scheduling problem with total completion time and total weighted completion time objectives

نویسندگان

  • Hongwei Li
  • Yuvraj Gajpal
چکیده

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs

This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...

متن کامل

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

An Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time

This paper explores the flexile flow lines where setup times are sequence- dependent. The optimization criterion is the minimization of total weighted completion time. We propose an iterated greedy algorithm (IGA) to tackle the problem. An experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of IGA are compared against those of some other exist...

متن کامل

حل مسئله زمان بندی ماشینهای موازی نامرتبط با اهداف کل زودکرد وزنی و کل دیرکرد وزنی با استفاده از الگوریتم جستجوی پراکنده چند هدفه

The parallel machine scheduling problem is an important and difficult problem to be considered in the real-world situations. Traditionally, this problem consists of the scheduling of a set of independent jobs on parallel machines with the aim of minimizing the maximum job completion. In today's manufacturing systems, in which both early and tardy finishing of job processing are undesired, the o...

متن کامل

A New Branch-and-Bound for the Problem of Mean Completion Time for the Single Machine with Release Time

Preemptively scheduling a set of independent jobs with release time on one processor is a historical problem. In this paper, the same problem has been considered in which objective is to minimize the mean flow time. To prepare a perfect branch-and-bound, some optimality conditions have been represented and they have been compared with the optimality conditions which have been proposed before. O...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017