Optimization under uncertainty of a composite fabrication process using a deterministic one-stage approach
نویسندگان
چکیده
Process design under uncertainty has received considerable attention in recent years, and has led to the development of several modeling and solution approaches. These approaches are broadly categorized under stochastic formulations (model parameters with probability distributions), multiperiod formulations (where uncertain parameters are discretized into a number of deterministic realizations), and parametric programming formulations. This paper presents an application of the one-stage optimization problem (OSOP), a multiperiod method, to find optimal cure temperature cycle design under uncertainty for polymer-matrix composites fabrication using the pultrusion process. The process is governed by a highly non-linear system of partial differential-algebraic equations. The OSOP method is also systematically compared with a sampling-based approach in terms of computational efficiency and solution quality. Most work done so far using such deterministic methods has focused on problems where the performance objective function (often cost) and process constraints are analytic/algebraic in nature. In contrast, in materials processing simulations, evaluation of the objective function and the process constraints are based on the solution of differential-algebraic equations (DAE). © 2006 Elsevier Ltd. All rights reserved.
منابع مشابه
3D BENCHMARK RESULTS FOR ROBUST STRUCTURAL OPTIMIZATION UNDER UNCERTAINTY IN LOADING DIRECTIONS
This study has been inspired by the paper "An efficient 3D topology optimization code written in MATLAB” written by Liu and Tovar (2014) demonstrating that SIMP-based three-dimensional (3D) topology optimization of continuum structures can be implemented in 169 lines of MATLAB code. Based on the above paper, we show here that, by simple and easy-to-understand modificati...
متن کاملA Single Machine Capacitated Production Planning Problem Under Uncertainty: A Grey Linear Programming Approach
The production planning is an important problem in most of manufacturing systems in practice. Unlike many researches existing in literature, this problem encounters with great uncertainties in parameters and input data. In this paper, a single machine capacitated production planning problem is considered and a linear programming formulation is presented. The production costs are assumed to be u...
متن کاملRobust production scheduling in open-pit mining under uncertainty: a box counterpart approach
Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...
متن کاملA Robust Optimization Methodology for Multi-objective Location-transportation Problem in Disaster Response Phase under Uncertainty
This paper presents a multi-objective model for location-transportation problem under uncertainty that has been developed to respond to crisis. In the proposed model, humanitarian aid distribution centers (HADC), the number and location of them, the amount of relief goods stored in distribution centers, the amount of relief goods sent to the disaster zone, the number of injured people transferr...
متن کاملA robust multi-objective global supplier selection model under currency fluctuation and price discount
Robust supplier selection problem, in a scenario-based approach has been proposed, when the demand and exchange rates are subject to uncertainties. First, a deterministic multi-objective mixed integer linear programming is developed; then, the robust counterpart of the proposed mixed integer linear programming is presented using the recent extension in robust optimization theory. We discuss dec...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & Chemical Engineering
دوره 30 شماره
صفحات -
تاریخ انتشار 2006