Scheduling with machine cost and rejection
نویسندگان
چکیده
In this paper we consider the scheduling problem with machine cost and rejection penalties. For this problem, we are given a sequence of independent jobs, each being characterized by its processing time (size) and its penalty. No machine is initially provided, and when a job is revealed the algorithm has the option to purchase new machines. Right when a new job arrives, we have the following choices: (i) reject it, in which case we pay its penalty; (ii) non-preemptively process it on an existing machine, which contributes to the machine load; (iii) purchase a new machine, and assign it to this machine. The objective is to minimize the sum of the makespan, the cost for purchasing machines, and the total penalty of all rejected jobs. For the small job case, (where all jobs have sizes no greater than the cost for purchasing one machine, and which is the generalization of the Ski-Rental Problem) we present an optimal online algorithm with a competitive ratio of 2.
منابع مشابه
Bi-level Model for Reliability based Maintenance and Job Scheduling
Many defects in manufacturing system are caused by human resources that show the significance of the human resources in manufacturing systems. Most manufacturers attempt to investigate the human resources in order to improve the work conditions and reduce the human error by providing a proper work-rest schedule. On the other hand, manufacturer deal with machine scheduling based on demand and wo...
متن کاملبهینه سازی هزینه کل تولید و زمان در سلول رباتیک سه ماشین
In this research, robotic cell scheduling problem with three CNC machines and with an operation on each machine with the purpose of optimizing manufacturing cost and time in S1 cycle has been investigated. To obtain the optimal total cost of production has been used the optimal processing time on machine operation. In this research, robotic cell scheduling is studied in three different situatio...
متن کاملA bicriteria approach to scheduling a single machine with job rejection and positional penalties
Single machine scheduling problems have been extensively studied in the literature under the assumption that all jobs have to be processed. However, in many practical cases, one may wish to reject the processing of some jobs in the shop, thus resulting in a rejection cost. In such a framework, the scheduler has to decide rst which jobs will be rejected and which will be accepted. Then he has t...
متن کاملOnline scheduling with machine cost and rejection
In this paper we define and investigate a new scheduling model. In this new model the number of machines is not fixed; the algorithm has to purchase the used machines, moreover the jobs can be rejected. We show that the simple combinations of the algorithms used in the area of scheduling with rejections and the area of scheduling with machine cost are not constant competitive. We present a 2.61...
متن کاملSINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Comb. Optim.
دوره 12 شماره
صفحات -
تاریخ انتشار 2006