B-225529 [Protest of Navy Contract Award for Support Activities for Fleet Exercise Planning]
ثبت نشده
چکیده
1. Contracting agency may properly make an award to a lower-priced, lower-rated offeror athough the solicitation provides that cost will be less important than technical factors in the selection, where the contracting officer resonably determines that the technical advantage from the highest-rated proposal is less significant than the possible cost savings from a lower-rated proposal and the costtechnical tradeoff is otherwise consistent with the evaluation scheme in the solicitation.
منابع مشابه
B-228888 [Protest of Navy Contract Award for Computer Subsystems]
1. Permitting one of two offerors to perform a second equipment demonstration (after first demonstration did not show the proposed computer system met all compatibility requirements) following receipt of best and final offers without reopening discussions with second offeror is unobjectionable where: (1) second offeror already had performed fully successful equipment demonstration; and (2) agen...
متن کاملB-250516.3 [Protest of DOE Subcontract Award for Commercial Data Communications Services]
Protest is sustained where: (1) proposal selected for award fails to comply with material solicitation requirement--offer of communications switch not yet built could not reasonably be viewed as meeting solicitation requirement that proposal conclusively demonstrate current availability of proposed technology; and (2) contracting officials conducted discussions with proposed awardee--by visitin...
متن کاملOptimizing Schedules for Maritime Humanitarian Cooperative Engagements from a United States Navy Sea Base
This paper introduces Global Fleet Station Mission Planner (GFSMP), an optimization tool to aid in mission planning and the scheduling of humanitarian assistance missions for the US Navy. GFSMP helps fleet staffs to examine how one naval ship, which was deployed for an extended period (e.g., six months), with embarked teams can best provide humanitarian assistance. We illustrate the application...
متن کاملBudgeting, Planning, and Contracting for the Rcoh
In this chapter, we review the sequence of events that resulted in the negotiated contractor work package and the subsequent string of contract modifications (see also Appendix A). It all began with a budget total established by the Navy in 1992. This was modified over the remainder of the decade in annual Navy budgets. The Navy, meanwhile, planned the work to be undertaken in the RCOH. NNS sub...
متن کاملSickness and injury in the Navy medical officer's report after Jutland.
On 9th March 1916 the Deputy Surgeon General of the Royal Navy, Robert Hill, joined the Iron Duke as Medical Officer and thus became Medical Officer of the Home Fleet. This position reflected the importance of the vessel as Admiral of the Fleet Jellicoe’s Headquarters at sea. The Royal Navy obviously anticipated action for below is an abridged copy of the report rendered by the Fleet Medical Of...