Safeway Designs Mixed-Product Pallets to Support Just-in-Time Deliveries
نویسندگان
چکیده
In 1998, Safeway milk plants began daily deliveries to most stores, doubling their delivery frequency. The new schedule increased the workloads for assembling orders at the milk plant by 20 percent because, under the new system, very few store orders called for full pallets of a single product, and store-specific mixed pallets were time consuming to assemble. To reduce the excess workload, we designed two types of standard mixed pallets that, in quantities of one to three, could satisfy part of the demands of many stores on most days, thereby reducing the need for store-specific mixed pallets. Our mathematical model optimizes the design of the standard mixed-product pallets. These mixed-product pallets can be assembled prior to the peak shipping periods and during other off-peak times to ease peak workloads and eliminate excessive overtime. Safeway implemented the solution without our assistance and continues to use it nearly five years after implementation with good results.
منابع مشابه
An Improved Optimization Model for Scheduling of a Multi-Product Tree-Like Pipeline
In the petroleum supply chain, oil refined products are often delivered to distribution centers by pipelines since they provide the most reliable and economical mode of transportation over large distances. This paper addresses the optimal scheduling of a complex pipeline network with multiple branching lines. The main challenge is to find the optimal sequence and time of product injections/deli...
متن کاملIntegrated JIT Lot-Splitting Model with Setup Time Reduction for Different Delivery Policy using PSO Algorithm
This article develops an integrated JIT lot-splitting model for a single supplier and a single buyer. In this model we consider reduction of setup time, and the optimal lot size are obtained due to reduced setup time in the context of joint optimization for both buyer and supplier, under deterministic condition with a single product. Two cases are discussed: Single Delivery (SD) case, and Multi...
متن کاملOptimally Loading Clocked Tow Trains for JIT-Supply of Mixed-Model Assembly Lines
In today's mixed-model assembly production, there are two recent trends in particular, namely increasing vertical integration and the proliferation of product variety, which more and more shift focus to an e cient just-in-time part supply. In this context, many automobile manufacturers set up decentralized logistics areas referred to as supermarkets . Here, small tow trains are loaded with part...
متن کاملA REVIEW ON SEQUENCING APPROACHES FOR MIXED-MODEL JUST-IN-TIME PRODUCTION SYSTEM
Research interests have been focused on the concept of penalizing jobs both for being early and for being tardy because not only of modern competitive industrial challenges of providing a variety of products at a very low cost by smoothing productions but also of its increasing and exciting computer applications. Here, sequencing approaches of the mixed- model just-in-time production systems is...
متن کاملAdvanced Supply Chain Information for Rule-Based Sequence Adaptions on a Mixed-Model Assembly Line with Unreliable Just-In-Sequence Deliveries
The proliferation of just-in-sequence (JIS) deliveries has raised the vulnerability of assemblies to costly production stoppages or rework due to missing components. Through a comprehensive real-time supply chain monitoring systems, these supply issues can be detected early and affected orders removed from planned assembly sequences in time to avoid production disturbances. Using simulation ana...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Interfaces
دوره 35 شماره
صفحات -
تاریخ انتشار 2005