Tarasht Power Plant Pc-based Simulator Implementation Turbine Case Study
نویسنده
چکیده
Economical operation of large scale systems like a power plant depends on the plant operators and their skills. There are some specific training courses which are presented by experts for the operators, but the operators need to experience in their own way. A methodology for increasing skills of the operators with less cost is to use power system simulators. The TARASHT power plant simulator has been designed and manufactured by Mitsubishi Heavy Industry Group based on a DEC VAX 4000 minicomputer. In a research work supported by the industry, a pc-based simulator was redesigned by Power and Water University of Technology (PWUT). In this paper the result of the project is presented. Copyright © 2002 IFAC
منابع مشابه
Dynamic Modeling and Identification of The Hydro Turbine Using Field Test Data (Case Study: Abbaspour Power Plant)
In order to study the stability and fast dynamic of the power grid, modeling and identification of hydropower plant systems such as turbine, governor and excitation is required. Turbine is a mechanical device and usually identified through field tests. In this paper, the identification of the unit 8 of Abbaspour power plant is conducted. The linear and nonlinear model of the Francis turbine are...
متن کاملEnergy and Exergo-Economic Assessments of Gas Turbine Based CHP Systems: A Case Study of SPGC Utility Plant
Combined heat and power systems are becoming more and more important, regarding their enhanced efficiency, energy saving, and environmental aspects. In the peresent study, three configurations of combined heat and power systems are intended as an alternative to separate production plant by considering environmental aspects. First and second laws of thermodynamics are adapted to the operatin...
متن کاملVelocity Adjustable Wind Turbine Simulator based onActual Wind Generator for Laboratory Use
The objective of this research is (1) to design and construct the wind turbine simulator based on the adjustable actual wind speed. (2) To investigate the wind distribution, and (3) tobe applied for testing the power output of the micro-wind turbine in the laboratory. Design and CAD drawing was applied to construct the wind turbine simulator prototype.The 3 phase induction motor with axial fan ...
متن کاملImplementation of a Real-Time Distributed Network Simulator with PC-Cluster
This paper describes the implementation of a real-time power system simulator based on a distributed cluster of PC desktop computers. A Real-time power system simulator based on a PC-cluster can successfully cope with the size requirements of growing power systems and the computational demands of fast transient studies. The distributed version of OVNI is used as core solver in addition to a dev...
متن کاملImproving Data-based Wind Turbine Using Measured Data Foggy Method
The purpose of this paper is to improve the modeling of the data-driven wind turbine system that receives data from noise signals. Most of the data on industrial systems is noisely and data noise is inevitable and natural. The method and idea proposed in this paper, Data Fogging, significantly reduce the impact of noise on data-driven wind turbine system modeling, which is the basis of this met...
متن کامل