The simultaneous reshuffle and yard crane scheduling problem in container terminals

نویسندگان

  • Jiao Zhao
  • Lixin Tang
چکیده

This paper studies the simultaneous reshuffle and yard crane scheduling problem in the yard of container terminals, which is one of the key logistics problems affecting the operation efficiency in container terminals. Although the reshuffle scheduling problem has received many research attention due to its importance, the problem without considering yard crane is not very practical, which is because the shuffle process needs yard crane to carry out, and the improper yard crane scheduling will weaken the optimized shuffle planning, therefore the reshuffle and yard crane scheduling should be considered simultaneously. The problem in this paper is to choose appropriate objective locations for the reshuffled containers and obtain the picking up sequence for all the containers on the yard crane, with the objective to reduce the sum of the total completion time for all the containers and the reshuffling time for all the reshuffled containers. A mixed integer model is proposed for the problem. A Particle Swarm Optimization (PSO) algorithm is employed to obtain near optimal solutions of the problem. The experiment results show that the solutions of the simultaneous scheduling problem are better than the results obtained by solving the reshuffle scheduling problem and the yard crane scheduling problem, respectively.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Yard crane scheduling in port container terminals using genetic algorithm

Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...

متن کامل

Quay Cranes and Yard Trucks Scheduling Problem at Container Terminals

A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...

متن کامل

Yard Crane Pools and Optimum Layouts for Storage Yards of Container Terminals

As more and more container terminals open up all over the world, competition for business is becoming very intense for container terminal operators. They are finding out that even to keep their existing Sea Line customers, they have to make them happy by offering higher quality service. The quality of service they can provide depends on their operating policies and the design of the terminal la...

متن کامل

A new approach for constraining failure probability of a critical deteriorating system Yard crane scheduling in port container terminals using genetic algorithm

In this paper, we focus on a continuously deteriorating critical equipment which its failure cannot be measured by cost criterion. For these types of systems like military systems, nuclear systems, etc it is extremely important to avoid failure during the actual operation of the system. In this paper we propose an approach which constrains failure probability to a pre-specified value. This valu...

متن کامل

Addressing a Coordinated Quay Crane Scheduling and Assignment Problem by Red Deer Algorithm

Nowadays, there is much attention for planning of container terminals in the global trade centers. The high cost of quay cranes motivates both scholars and industrial practitioners especially in the last decade to develop novel optimization models to address this dilemma. This study proposes a coordinated optimization model to cover both Quay Crane Scheduling Problem (QCSP) and Quay Crane Assig...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012