Two-machine flowshop scheduling with flexible operations and controllable processing times
نویسندگان
چکیده
TWO-MACHINE FLOWSHOP SCHEDULING WITH FLEXIBLE OPERATIONS AND CONTROLLABLE PROCESSING TIMES Zeynep Uruk M.S. in Industrial Engineering Advisor: Prof. Dr. Selim Aktürk Co-Advisor: Asst. Prof. Dr. Hakan Gültekin August, 2011 In this study, we consider a two-machine flowshop scheduling problem with identical jobs. Each of these jobs has three operations, where the first operation must be performed on the first machine, the second operation must be performed on the second machine, and the third operation (named as flexible operation) can be performed on either machine but cannot be preempted. Highly flexible CNC machines are capable of performing different operations as long as the required cutting tools are loaded on these machines. The processing times on these machines can be changed easily in albeit of higher manufacturing cost by adjusting the machining parameters like the speed of the machine, feed rate, and/or the depth of cut. The overall problem is to determine the assignment of the flexible operations to the machines and processing times for each job simultaneously, with the bicriteria objective of minimizing the manufacturing cost and minimizing makespan. For such a bicriteria problem, there is no unique optimum but a set of nondominated solutions. Using ǫ constraint approach, the problem could be transformed to be minimizing total manufacturing cost objective for a given upper limit on the makespan objective. The resulting single criteria problem is a nonlinear mixed integer formulation. For the cases where the exact algorithm may not be efficient in terms of computation time, we propose an efficient approximation algorithm.
منابع مشابه
A Flexible Job Shop Scheduling Problem with Controllable Processing Times to Optimize Total Cost of Delay and Processing
In this paper, the flexible job shop scheduling problem with machine flexibility and controllable process times is studied. The main idea is that the processing times of operations may be controlled by consumptions of additional resources. The purpose of this paper to find the best trade-off between processing cost and delay cost in order to minimize the total costs. The proposed model, flexibl...
متن کاملSolving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm
In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...
متن کاملSINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملMinimizing Total Weighted Tardiness in a Flexible Flowshop Environment Considering Batch Processing Machines
Scheduling in production environments is used as a competitive tool to improve efficiency and respond to customer requests. In this paper, a scheduling problem is investigated in a three-stage flexible flowshop environment with the consideration of blocking and batch processing. This problem has been inspired by the charging and packaging line of a large battery manufacturer. In this environmen...
متن کاملMinimizing the energy consumption and the total weighted tardiness for the flexible flowshop using NSGA-II and NRGA
This paper presents a bi-objective MIP model for the flexible flow shop scheduling problem (FFSP) in which the total weighted tardiness and the energy consumption are minimized simultaneously. In addition to considering unrelated machines at each stage, the set-up times are supposed to be sequence- and machine-dependent, and it is assumed that jobs have different release tim...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Computers & OR
دوره 40 شماره
صفحات -
تاریخ انتشار 2013