Project Monitoring and Control in Model-driven and Component-based Development of Embedded Systems - The CARMA Principle and Preliminary Results
نویسندگان
چکیده
This position paper describes how the combination of the Model-Driven Development (MDD) and Component-Based Software Engineering (CBSE) paradigms can support project monitoring and control, and project risk reduction. The core principle for this is articulated and named CARMA, and our research agenda and preliminary results are described. Through interviews, industry input, process simulation, tool implementation and pilot projects, and describing an extension of CMMI, we are exploring the CARMA principle in order to provide guidelines for MDD/CBSE projects.
منابع مشابه
A Model-Driven Decision Support System for Software Cost Estimation (Case Study: Projects in NASA60 Dataset)
Estimating the costs of software development is one of the most important activities in software project management. Inaccuracies in such estimates may cause irreparable loss. A low estimate of the cost of projects will result in failure on delivery on time and indicates the inefficiency of the software development team. On the other hand, high estimates of resources and costs for a project wil...
متن کاملDeveloping a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System
Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...
متن کاملThe Opportunities Afforded by Embedded Computer Systems for Monitoring and Control of Industrial Processes in Less-Industrialised Countries (TECHNICAL NOTE)
The dramatic changes in integrated-circuit technology over the last two decades have been of great benefit to countries such as Zimbabwe. High volume production of VLSI chips has produced a supply of intelligent, versatile electronic processing devices at very low cost. In particular the facilities of the microcontroller have steadily developed to the accompaniment of a reduction in price. Sinc...
متن کاملA Simulation Based of Setting Policy in Project Acceptance Based on Experiences in Project-Driven SME's
The acceptance of the right project which leads to the realization of the set objectives is one of the most important issues in project-oriented companies. Therefore, corporate managers prefer to work on those projects which ensures the achievement of goals such as increasing financial profits or being the top brands in their rivals market. The present research aimed at introducing a systemat...
متن کاملSelf-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices
Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...
متن کامل