Proj ect Scheduling with Discounted Cash Flows and Progress Payments

نویسنده

  • CANAN SEPIL
چکیده

In all large scale projects, there correspond cash flows that incur throughout the life of the project. The scheduling of these projects to maximize the present value of the cash flows has been a topic of recent research. The basic assumption of earlier research is that the cash flows are mainly associated with some events of the project and they occur at the event realization times. However, in several real life projects, the cash inflows do not occur at the event realization times, rather they occur at the end of some time periods, like months, as progress payments. In this article, maximizing the present value of the cash flows in such projects is considered and a mixed-integer formulation of the problem is presented. In this formulation, activity profit curves are defined and used. Computational experience on some randomly generated test problems provides promising results especially when the Benders Decomposition technique is employed for solving the problem.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Resource Investment Problem With Discounted Cash Flows

A resource investment problem is a project-scheduling problem in which the availability levels of the resources are considered decision variables and the goal is to find a schedule and resource requirement levels such that some objective function optimizes. In this paper, we consider a resource investment problem in which the goal is to maximize the net present value of the project cash flows. ...

متن کامل

Resource Investment Problem with Discounted Cash Flows

A resource investment problem is a project-scheduling problem in which the availability levels of the resources are considered as decision variables and the goal is to find a schedule, and resource requirement levels, such that some objective function optimizes. In this paper, we consider a resource investment problem in which the goal is to maximize the net present value of the project cash fl...

متن کامل

Four Payment Models for the Multi-Mode Resource Constrained Project Scheduling Problem with Discounted Cash Flows

In this paper, the multi-mode resource constrained project scheduling problem with discounted cash flows is considered. The objective is the maximization of the net present value of all cash flows. Time value of money is taken into consideration, and cash inand outflows are associated with activities and/or events. The resources can be of renewable, nonrenewable, and doubly constrained resource...

متن کامل

A New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

Project resource investment problem under progress payment model

As a general branch of project scheduling problems, resource investment problem (RIP) considers resource availabilities as decision variables to determine a level of employed resources minimizing the costs of the project. In addition to costs (cash outflows), researchers in the later extensions of the RIP took payments (cash inflows) received from clients into account and used the net present v...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007