An efficient algorithm for the earliness-tardiness scheduling problem
نویسندگان
چکیده
This paper addresses the one-machine scheduling problem with earliness-tardiness penalties. We propose a new branch-and-bound algorithm that can solve instances with up to 50 jobs and that can solve problems with even more general non-convex cost functions. The algorithm is based on the combination of a Lagrangean relaxation of resource constraints and new dominance rules.
منابع مشابه
A comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times
In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...
متن کاملSingle-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production
Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...
متن کاملElectromagnetism-like algorithm for fuzzy flow shop batch processing machines scheduling to minimize total weighted earliness and tardiness
In this paper, we study a flow shop batch processing machines scheduling problem. The fuzzy due dates are considered to make the problem more close to the reality. The objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness. In order to tackle the given problem, we propose a hybrid electromagnetism-like (EM) algorithm, in which the EM is hybridized with a diversi...
متن کاملA New Multi-objective Job Shop Scheduling with Setup Times Using a Hybrid Genetic Algorithm
This paper presents a new multi objective job shop scheduling with sequence-dependent setup times. The objectives are to minimize the makespan and sum of the earliness and tardiness of jobs in a time window. A mixed integer programming model is developed for the given problem that belongs to NP-hard class. In this case, traditional approaches cannot reach to an optimal solution in a reasonable...
متن کاملAn improved memetic algorithm to minimize earliness–tardiness on a single batch processing machine
In this research, a single batch processing machine scheduling problem with minimization of total earliness and tardiness as the objective function is investigated.We first formulate the problem as a mixed integer linear programming model. Since the research problem is shown to be NP-hard, an improved memetic algorithmis proposed to efficiently solve the problem. To further enhance the memetic ...
متن کاملParticle swarm optimization for minimizing total earliness/tardiness costs of two-stage assembly flowshop scheduling problem in a batched delivery system
This paper considers a two-stage assembly flow shop scheduling problem. When all parts of each product are completed in the first stage, they are assembled into a final product on an assembly machine in the second stage. In order to reduce the delivery cost, completed products can be held until completion of some other products to be delivered in a same batch. The proposed problem addresses sch...
متن کامل