Cooperation in Multi-organization Scheduling

نویسندگان

  • Fanny Pascual
  • Krzysztof Rzadca
  • Denis Trystram
چکیده

The distributed nature of the grid results in the problem of scheduling parallel jobs produced by several independent organizations that have partial control over the system. We consider systems composed of n identical clusters of m processors. We show that it is always possible to produce a collaborative solution that respects participant’s selfish goals, at the same time improving the global performance of the system. We propose algorithms with a guaranteed worst-case performance ratio on the global makespan: a 3-approximation algorithm if the last completed job requires at most m/2 processors, and a 4-approximation algorithm in the general case.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

A Cooperation Language

This papex introduces CooL, a programming language for building cooperative applications. It combines the expressiveness of a h~gh-level AOP-language with the efficiency required by industrial applications. It integrates the support for planning and scheduling with efficient execution on the single agent as well as multi-agent levels (cooperation). CooL’s knowledge representation and execution ...

متن کامل

Multi-agent Cooperation: A Description Logic View

In this paper we propose dynamic description logic for formalizing multi-agent cooperation process with a clearly defined syntax and semantics. By combining the features of knowledge representation and reasoning of description logic and action theory for multi-agent interaction, our logic is effective and significant both for static and dynamic environment. On the static side, we employ descrip...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007