Project cash flow analysis in the presence of uncertainty in activity duration and cost

نویسندگان

  • Alexander Maravas
  • John-Paris Pantouvakis
چکیده

The inherent uncertainty and imprecision in project scheduling have motivated the proposal of several fuzzy set theory based extensions of activity network scheduling techniques. Building upon these, a cash flow calculationmethodology for projects including activitieswith fuzzy durations and/or costs is proposed in this paper. According to the proposed approach, the project cash flow is represented by an S-surface (as opposed to the traditional S-curve) ensuing by connecting S-curves at different risk possibility levels. Themethodology is exemplified by estimating the working capital requirements in a real world road construction project. Furthermore, the benefits of the methodology and its subsequent computerization are discussed. It is believed that the proposed approach may also be useful for both evaluating project proposals during feasibility studies and for performing earned value analysis for project monitoring and control. © 2011 Elsevier Ltd. and IPMA. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS II. SOUNDS OF SILENCE: A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA HARMONY SEARCH METAHEURISTIC

In this paper, we present a new idea for robust project scheduling combined with a cost-oriented uncertainty investigation. The result of the new approach is a makespan minimal robust proactive schedule, which is immune against the uncertainties in the activity durations and which can be evaluated from a cost-oriented point of view on the set of the uncertain-but-bounded duration and cost param...

متن کامل

A New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets

  Uncertainty plays a major role in any project evaluation and management process. One of the trickiest parts of any production project work is its cost and time forecasting. Since in the initial phases of production projects uncertainty is at its highest level, a reliable method of project scheduling and cash flow generation is vital to help the managers reach successful implementation of the ...

متن کامل

An Assessment Method for Project Cash Flow under Interval-Valued Fuzzy Environment

Effective project management requires reliable knowledge of cash required in different stages of project life cycle. Getting this knowledge is highly dependent on sophisticated consideration of project environment. Nature of projects and their environments are associated with uncertain conditions. In this paper, a new project cash flow assessment method based on project scheduling is proposed t...

متن کامل

ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH

This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...

متن کامل

An Optimal NPV Project Scheduling with Fixed Work Content and Payment on Milestones

    Project scheduling   Net present value   We consider a project scheduling problem with permitted tardiness and discrete time/resource trade-offs under maximum net present value objective. In this problem, a project consists of a set of sequential phases such that each phase contains one or more sub-projects including activities interrelated by finish-start-type precedence relations with a t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015