Towards Finding Robust Execution Strategies for RCPSP/max with Durational Uncertainty

نویسندگان

  • Na Fu
  • Pradeep Varakantham
  • Hoong Chuin Lau
چکیده

Resource Constrained Project Scheduling Problems with minimum and maximum time lags (RCPSP/max) have been studied extensively in the literature. However, the more realistic RCPSP/max problems – ones where durations of activities are not known with certainty – have received scant interest and hence are the main focus of the paper. Towards addressing the significant computational complexity involved in tackling RCPSP/max with durational uncertainty, we employ a local search mechanism to generate robust schedules. In this regard, we make two key contributions: (a) Introducing and studying the key properties of a new decision rule to specify start times of activities with respect to dynamic realizations of the duration uncertainty; and (b) Deriving the fitness function that is used to guide the local search towards robust schedules. Experimental results show that the performance of local search is improved with the new fitness evaluation over the best known existing approach.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Robust Local Search for Solving RCPSP/max with Durational Uncertainty

Scheduling problems in manufacturing, logistics and project management have frequently been modeled using the framework of Resource Constrained Project Scheduling Problems with minimum and maximum time lags (RCPSP/max). Due to the importance of these problems, providing scalable solution schedules for RCPSP/max problems is a topic of extensive research. However, all existing methods for solving...

متن کامل

A Proactive Sampling Approach to Project Scheduling under Uncertainty

Uncertainty in activity durations is a key characteristic of many real world scheduling problems in manufacturing, logistics and project management. RCPSP/max with durational uncertainty is a general model that can be used to represent durational uncertainty in a wide variety of scheduling problems where there exist resource constraints. However, computing schedules or execution strategies for ...

متن کامل

Robust Partial Order Schedules for RCPSP/max with Durational Uncertainty

In this work, we consider RCPSP/max with durational uncertainty. We focus on computing robust Partial Order Schedules (or, in short POS) which can be executed with risk controlled feasibility and optimality, i.e., there is stochastic posteriori quality guarantee that the derived POS can be executed with all constraints honored and completion before robust makespan. To address this problem, we p...

متن کامل

Robust execution strategies for project scheduling with unreliable resources and stochastic durations

The Resource Constrained Project Scheduling Problem with minimum and maximum time lags (RCPSP/max) is a general model for resource scheduling in many real-world problems (such as manufacturing and construction engineering). We consider RCPSP/max problems where the durations of activities are stochastic and resources can have unforeseen breakdowns. Given a level of allowable risk, α, our mechani...

متن کامل

Robust Execution of Probabilistic Temporal Plans

A critical challenge in temporal planning is robustly dealing with non-determinism, e.g., the durational uncertainty of a robot’s activity due to slippage or other unexpected influences. Recent advances show that robustness is a better measure of solution quality than traditional metrics such as flexibility. This paper introduces the Robust Execution Problem for finding maximally robust dispatc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010