A Study of Using Simulation to Overcome Obstacles That Block the Implementation of Critical Chain Project Management to Project Management Environment

نویسندگان

  • Chia-Ling HUANG
  • Rong-Kwei LI
  • Chih-Hung TSAI
  • Yi-Chan CHUNG
  • Yao-Wen HSU
چکیده

Since 1997, the Critical Chain Project Management (CCPM) method has received considerable attention. Hundreds of successful CCPM cases have achieved highly reliable on-time delivery (OTD) with short project lead-time (PLT) in multi-project environments. However, two obstacles have remained, blocking the implementation of CCPM to project management (PM) society. The first has been addressed by PM practitioners, who have been less than confident that OTD and PLT can be significantly improved by simply changing the way to manage multi-projects. The second is from academia: some scholars have claimed that the ideas of CCPM are not new and are of no substantial contribution to Project Management Body of Knowledge (PMBOK). In this study, we first used multi-project management games to overcome the first obstacle. A comparative study of CCPM and Program Evaluation and Review Technique/Critical Path Method (PERT/CPM) planning methods, excluding bad human behaviors, was then conducted to overcome the second obstacle. The simulation results show that: (1) the “mode of managing multi-projects” was the root cause, and changing the mode of managing multi-project could significantly improve OTD and PLT; (2) in terms of mean project time, CCPM is not significantly better than PERT/CPM. However, in terms of plan reliability, CCPM achieves higher than PERT and CPM. This is due to a CCPM logistical change that generates a more reasonable and reliable project plan than do the PERT/CPM methods.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Risk Management Plan in Large Urban Projects

One of the risks distinguishes urban projects from other projects is to purchase of property obstacles. The matter is of more significance in large projects. Issues with regard to possessing property obstacles, lack of accurate layout drawings for underground facilities and following probable changes in designs make it vital to have specific studies on risk management of such projects. So thi...

متن کامل

Towards Measuring the Project Management Process During Large Scale Software System Implementation Phase

Project management is an important factor to accomplish the decision to implement large-scale software systems (LSS) in a successful manner. The effective project management comes into play to plan, coordinate and control such a complex project. Project management factor has been argued as one of the important Critical Success Factor (CSF), which need to be measured and monitored carefully duri...

متن کامل

Optimization of Time, Cost, and Quality in Critical Chain Method Using Simulated Annealing (RESEARCH NOTE)

In the last decade, theory of constraint application in project management lead to make a new approach for project scheduling and control as a critical chain. In this paper, a multi-objective optimization model for multi-project scheduling on critical chain is investigated. The objectives include time, cost and quality. In order to solve the problem, a Simulated Annealing algorithm is developed...

متن کامل

Fuzzy Multi-Objective Linear Programming for Project Management Decision under Uncertain Environment with AHP Based Weighted Average Method

Smooth implementation and controlling conflicting goals of a project with the usage of all related resources through organization is inherently a complex task to management. At the same time deterministic models are never efficient in practical project management (PM) decision problems because the related parameters are frequently fuzzy in nature. The project execution time is a major concern o...

متن کامل

Project Time and Cost Forecasting using Monte Carlo simulation and Artificial Neural Networks

The aim of this study is to present a new method to predict project time and cost under uncertainty. Assuming that what happens in projects implementation which is expressed in the form of Earned Value Management (EVM) indicators is primarily related to the nature of randomness or unreliability, in this study, by using Monte Carlo simulation, and assuming a specific distribution for the time an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014