Runway paving: Taking a different approach
نویسنده
چکیده
Hot Mix Asphalt (HMA) paving of airport runways mostly requires multiple paving teams, multiple pavers, and a wide array of other equipment. The runway paving projects are typically renowned for the logistical effort and the tight margins for overruns, often requiring a relatively large part of the contractor’s resources. Due to the nature of airport operations the projects are of a fast-track nature and planned meticulously. The large-scale nature of the projects raise the attention of the media and contractors often use them as showcases. Although their project characteristics are well known and often appeal to the imagination, the projects have little attention in scientific journals from a process and operations management perspective. We present research ideas on operational matters, process and quality control issues relevant for runway HMA paving construction. It builds on our research experience in the area of highway asphalt paving. We describe the current state of the asphalt paving process and provide a brief overview of the sparse publications in the area. Based on a limited oral inquiry amongst Dutch experts – we present a first list of issues typical for runway asphalt paving operations. We hone in on variability encountered during HMA paving operations and operational strategies necessary for consistent paving and compaction. Lastly, we present technologies and approaches to improve the operational control and subsequent quality consistency during runway HMA paving operations.
منابع مشابه
A Statistical Analysis of the Aircraft Landing Process
Managing operations of the aircraft approach process and analyzing runway landing capacity, utilization and related risks require detailed insight into the stochastic characteristics of the process. These characteristics can be represented by probability distributions. The focus of this study is analyzing landings on a runway operating independent of other runways making it as a single runway. ...
متن کاملCooperative Control of Mobile Robots in Creating a Runway Platform for Quadrotor Landing
Multi-agent systems are systems in which several agents accomplish a mission in a cooperative manner. In this paper, a novel idea for the construction of a movable runway platform based on multi-agent systems is presented. It is assumed that an aerial agent (quadrotor) decides to make an emergency landing due to reasons such as a decrease in energy level or technical failure, while there is no ...
متن کاملA Note on Runway Capacity Definition and Safety
The following is a discussion on the different aspects of the term capacity as well as a brief look at the commonly used capacity definitions in industrial and operations engineering in general and in Civil Aviation in particular. We maintain that quality factors (including more specifically here, safety) must be explicitly considered in runway capacity definition, and accordingly, we provide a...
متن کاملRunway incursion alert using knowledge rules
A runway incursion is a situation where two or more aircraft or vehicles occupy one runway simultaneously and as such create a potentially dangerous situation. We can think of many situations where two aircraft/vehicles occupy the same runway simultaneously, but do not cause a conflicting situation, e.g. two taxiing aircraft on a closed runway or a departing aircraft lining up behind a landing ...
متن کاملEffects of approach lighting and variation in visible runway length on perception of approach angle in simulated night landings.
Previous experiments in this laboratory have demonstrated illusions due to variations in both length and width of runways in nighttime "black hole" approaches. Even though approach lighting is not designed to provide vertical guidance, it is possible that cues from approach lights could interact with cues from runway lighting to reduce illusions due to variation in runway size. Two experiments ...
متن کامل