Searching for Gas Turbine Maintenance Schedules

نویسندگان

  • Markus Bohlin
  • Kivanc Doganay
  • Per Kreuger
  • Rebecca Steinert
  • Mathias Wärja
چکیده

costs associated with them but is also costly when done frequently. That is why substantial efforts have been invested in minimizing the expected total cost due to failures and preventive maintenance of industrial equipment (Dekker 1996, Tan and Kramer 1997, Bäckert and Rippin 1985, Dekker and Scarf 1998). In industry, most preventive-maintenance approaches include the use of fixed schedules, optimized in advance for minimum cost. However, there are many situations in which maintenance replanning is necessary to operate with as low cost as possible. For example, unexpected breakdowns force the production unit to stop for emergency repair, and performing other maintenance tasks at the same time can save time and money. In addition, the increasing use of condition monitoring leads to more unpredictable maintenance events and a need for dynamic planning. In this article, we present the ideas behind the preventivemaintenance optimizer (PMOPT) tool used to optimize gas turbine maintenance schedules. We developed PMOPT for Siemens Industrial Turbomachinery AB (SIT AB), one of the leading manufacturers of gas turbines of small and medium size. Gas turbines are used for power generation in various production facilities that often have high down time costs. A gas turbine in the form of a jet engine is depicted in figure 1. Axial flow gas turbines (including many industrial gas turbines) are constructed using a compressor, which produces compressed air to a combustion chamber, where fuel is injected. The resulting mixture is Articles

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Gas-Turbine Condition Monitoring Using Qualitative Model-Based Diagnosis

Given the critical nature of gas turbines in most industrial plants, their availability is of prime importance. Associated maintenance costs can also be extremely high and hence, it is a high priority to find ways of reducing maintenance costs and increasing the availability of the gas turbine. Routine preventative maintenance techniques have been used for many years to minimise major problems ...

متن کامل

Development, Implementation and Validation of a Vibration Expert System for Gas Turbine Engines

With the adoption of a condition based maintenance philosophy, a major gas turbine engine manufacturer has initiated a project to develop and implement an Expert Diagnostic System (EDS) to supplement its automated machinery vibration condition assessment program. The goal of this work is to enhance operational readiness, to promote maintenance self-sufficiency and to reduce overall life-cycle c...

متن کامل

Model-based Reasoning Approach for Automated Failure Analysis: An Industrial Gas Turbine Application

Keeping up with the technological advances, turbomachinery industry aspires to integrate manufacturing, servicing and maintenance of their plants. Typically, these objectives may be accomplished by adoption of condition monitoring services and diagnostic solutions, resulting in improved plant operations, lower maintenance cost, and impart safety and reliability. Specifically, failure analysis, ...

متن کامل

TIGER: Knowledge Based Gas Turbine Condition Monitoring

Given the critical nature of gas turbines in most industrial plants, their availability is of prime importance. Associated maintenance costs can also be extremely high and hence, it is a high priority to find ways of reducing maintenance costs and increasing the availability of the gas turbine. Routine preventative maintenance techniques have been used for many years to minimise major problems ...

متن کامل

Reliability and Cost-Benefit Analysis of a Power Plant Comprising two Gas and one Steam Turbines with Scheduled Inspection

A reliability model for a power generating system comprising two gas turbines and one steam turbine is developed wherein scheduled inspection is done at regular interval of time for maintenance. Initially, all the three units i.e. two gas turbines as well as one the steam turbine are operating and working of the system is called the working at full capacity. On failure of one of the gas turbine...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • AI Magazine

دوره 31  شماره 

صفحات  -

تاریخ انتشار 2010