Does a Rubber Baseline Guarantee Cost Overruns on Defense Acquisition Contracts?

نویسندگان

  • David S. Christensen
  • James A. Gordon
چکیده

A common assertion in the defense literature is that an unstable budget baseline contributes to cost overruns on defense acquisition contracts. Using cost performance data from over 400 defense acquisition contracts, we tested this assertion. The stability of the baseline was characterized by the number of significant changes to the budget, and by a statistical measure of the baseline's variability, the coefficient of variation. Cost performance was characterized by cost and schedule performance indices. Using two statistical methods we found no significant relationships between baseline instability and cost overruns. Further, these results were insensitive to the managing service, the buying activity, and the contract type. Changes on a defense contract are not compelling rationale for cost overruns. Other possible causal factors should be more closely examined.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A More Flexible Approach to Valuing Flexibility

The DOD routinely demonstrates its capability to develop phenomenal systems; however, these accomplishments are often tarnished by substantial cost and schedule overruns. While defense policies are continually being revised to address these problems, many believe that a more fundamental source of these overruns is the lack of flexibility in the systems being developed. But providing justificati...

متن کامل

Modularity as an Enabler for Evolutionary Acquisition

The end of the cold war witnessed several significant changes in the defense acquisition environment. Budgets declined and the scope of missions expanded. At first, the DoD did not respond well to these pressures resulting in cost overruns and schedule delays becoming the norm. In an effort to change this situation, national security officials decided to fundamentally change the way systems wer...

متن کامل

A Study of Best Practice Adoption by Defense Acquisition Programs

Defense (DoD) spends an estimated $20 billion a year on software to support its infrastructure; operate its weapons systems ; and provide command, control, communications, computing, intelligence, surveillance, and reconnaissance functions. DoD acquires the large majority of this software from contractor sources. There have been significant cost overruns and schedule delays experienced in DoD s...

متن کامل

Investigation of Significant Factors Influencing Time and Cost Overruns in Indian Construction Projects

Time overruns and Cost overruns has been a major issue in many Indian construction projects. The successful execution of construction projects and keeping them within prescribed schedule and cost is very important for effective time performance and cost performance. This research work is carried out on studying significant factors causing Time overruns and Cost overruns in Indian construction p...

متن کامل

A Cost-Based Decision Tool for Valuing DoD System Design Options

The DoD has frequently demonstrated its ability to procure phenomenal systems; however, these accomplishments are often tarnished by substantial cost and schedule overruns. While defense acquisition policies are continually being revised to address these perennial problems, many believe that a more fundamental source of these overruns is the lack of flexibility in the systems being developed, w...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002