Fuzzy extensions to Integer Programming models of cell-formation problems in machine scheduling

نویسندگان

  • Grammatoula Papaioannou
  • John M. Wilson
چکیده

Cell formation has received much attention from academicians and practitioners because of its strategic importance to modern manufacturing practices. Existing research on cell formation problems using integer programming (IP) has achieved the target of solving problems that simultaneously optimise: (a) cell formation (b) machine-cell allocation, and (c) part-machine allocation. This paper will present extensions of the IP model where part-machine assignment and cell formation are addressed simultaneously, and also a significant number of constraints together with an enhanced objective function are considered. The main study examines the integration of inter-cell movements of parts and machine set-up costs within the objective function, and also the combination of machine set-up costs associated with parts revisiting a cell when part machine operation sequence is taken into account. The latter feature incorporates a key set of constraints which identify the number of times a part travels back to a cell for a later machine operation. Due to two main drawbacks of IP modelling for cell formation, i.e. (a) only one objective function can be involved and (b) the decision maker is required to specify precisely goals and constraints, fuzzy elements like fuzzy constraints and fuzzy goals will be considered in the proposed model. Overall the paper will not only include an extended and enhanced integer programming model for assessing the performance of cell formation, but also perform a rigorous study of fuzzy integer programming and demonstrate the feasibility of achieving better and faster clustering results using fuzzy theory.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

Two-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect

This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...

متن کامل

Solving Single Machine Sequencing to Minimize Maximum Lateness Problem Using Mixed Integer Programming

Despite existing various integer programming for sequencing problems, there is not enoughinformation about practical values of the models. This paper considers the problem of minimizing maximumlateness with release dates and presents four different mixed integer programming (MIP) models to solve thisproblem. These models have been formulated for the classical single machine problem, namely sequ...

متن کامل

Robust optimization of a mathematical model to design a dynamic cell formation problem considering labor utilization

Cell formation (CF) problem is one of the most important decision problems in designing a cellular manufacturing system includes grouping machines into machine cells and parts into part families. Several factors should be considered in a cell formation problem. In this work, robust optimization of a mathematical model of a dynamic cell formation problem integrating CF, production planning and w...

متن کامل

A multi-product vehicle routing scheduling model with time window constraints for cross docking system under uncertainty: A fuzzy possibilistic-stochastic programming

Mathematical modeling of supply chain operations has proven to be one of the most complex tasks in the field of operations management and operations research. Despite the abundance of several modeling proposals in the literature; for vast majority of them, no effective universal application is conceived. This issue renders the proposed mathematical models inapplicable due largely to the fact th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Annals OR

دوره 166  شماره 

صفحات  -

تاریخ انتشار 2009