A Multistage Stochastic Programming Approach for the Planning of Offshore Oil or Gas Field Infrastructure Under Decision Dependent Uncertainty
نویسندگان
چکیده
The planning of offshore oil or gas field infrastructure under uncertainty is addressed in this paper. The main uncertainties considered are in the initial maximum oil or gas flowrate, recoverable oil or gas volume and water breakthrough time of the reservoir, which are represented by discrete distributions. Furthermore, it is assumed that these uncertainties are not immediately realized, but are gradually revealed as a function of design and operation decisions. In order to account for these decision-dependent uncertainties, we propose a multistage stochastic programming model that captures the complex economic objectives and nonlinear reservoir behavior, and simultaneously optimizes the investment and operation decisions over the entire planning horizon. The proposed solution algorithm relies on a duality based branch and bound method involving subproblems as nonconvex mixed-integer nonlinear programs. Several examples involving nonlinear reservoir models are presented to illustrate the application of the proposed method.
منابع مشابه
Multistage stochastic programming approach for offshore oilfield infrastructure planning under production sharing agreements and endogenous uncertainties
The paper presents a new optimization model and solution approach for the investment and operations planning of offshore oil and gas field infrastructure. As compared to previous models where fiscal rules and uncertainty in the field parameters are considered separately, the proposed model is the first one in the literature that includes both of these complexities in an efficient manner. In par...
متن کاملOffshore Oilfield Development Planning under Uncertainty and Fiscal Considerations
The objective of this paper is to present a unified modeling framework to address the issues of uncertainty and complex fiscal rules in the development planning of offshore oil and gas fields which involve critical investment and operational decisions. In particular, the paper emphasizes the need to have as a basis an efficient deterministic model that can account for various alternatives in th...
متن کاملA Defined Benefit Pension Fund ALM Model through Multistage Stochastic Programming
We consider an asset-liability management (ALM) problem for a defined benefit pension fund (PF). The PF manager is assumed to follow a maximal fund valuation problem facing an extended set of risk factors: due to the longevity of the PF members, the inflation affecting salaries in real terms and future incomes, interest rates and market factors affecting jointly the PF liability and asset p...
متن کاملA Stochastic Programming Approach for a Multi-Site Supply Chain Planning in Textile and Apparel Industry under Demand Uncertainty
In this study, a new stochastic model is proposed to deal with a multi-product, multi-period, multi-stage, multi-site production and transportation supply chain planning problem under demand uncertainty. A two-stage stochastic linear programming approach is used to maximize the expected profit. Decisions such as the production amount, the inventory level of finished and semi-finished product, t...
متن کاملiii OPTIMAL INFRASTRUCTURE MAINTENANCE SCHEDULING PROBLEM UNDER BUDGET UNCERTAINTY
This research addresses a general class of infrastructure asset management problems. Infrastructure agencies usually face budget uncertainties that will eventually lead to suboptimal planning if maintenance decisions are made without taking the uncertainty into consideration. It is important for decision makers to adopt maintenance scheduling policies that take future budget uncertainty into co...
متن کامل