Effects of Collaboration in Projects on Construction Project Performance

نویسندگان

  • Patrik Löfgren
  • Per Erik Eriksson
چکیده

Collaboration among project actors has been subjected to much attention in recent years within the field of construction management. Several case studies support the argument that collaboration has positive effects on project performance. There is however, a need for quantitative studies investigating statistical relationships between collaboration and performance. Joint activities and collaborative tools (e.g. workshops, joint objectives, and teambuilding activities) are commonly used in order to establish a collaborative spirit among project actors. The purpose of this research is to investigate how collaborative tools affect collaboration and further collaboration’s effect on project performance. The empirical data was collected through a survey responded to by 106 Swedish construction clients. Results from hierarchical regression analyses show a positive relationship between collaborative tools and collaboration suggesting that joint activities are crucial for collaboration to emerge. A positive relationship was also found between collaboration and project performance. The statistical results support previous case study findings where collaboration is positively affected by joint activities and project performance is enhanced by collaboration.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Time Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry

This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...

متن کامل

Methodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction

The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...

متن کامل

Evaluation of Project Critical Success Factors for Key Construction Players and Objectives

Critical Success Factors (CSFs) are used to support and evaluate the success of a strategic and tactical approach in project implementation in order to increase the probability of success. This system is used by executors in project delivery to achieve improved performance capabilities with limited resources. The present paper aims to identify the impact of CSFs amongst the main elements involv...

متن کامل

Developing an Integrated Simulation Model of Bayesian-networks to Estimate the Completion Cost of a Project under Risk: Case Study on Phase 13 of South Pars Gas Field Development Projects

Objective: The aim of this paper is to propose a new approach to assess the aggregated impact of risks on the completion cost of a construction project. Such an aggregated impact includes the main impacts of risks as well as the impacts of interactions caused by dependencies among them. Methods: In this study, Monte Carlo simulation and Bayesian Networks methods are combined to present a frame...

متن کامل

Development and Validation of Active Performance Indicators of Electrical Safety Using Bow-Tie and Bayesian Network Techniques Case Study: Oil and Gas Industries Construction Projects

Background: With the developing use of electricity in all aspects of human life, electricity accidents have also increased. One of the main components of the for the prevention policy, is the safety performance assessment of the organization's or industry's by using appropriate performance indicators with related operations.   Method: This study was a descriptive-analytical of 6 steps inc...

متن کامل

بررسی اثرات تغییر شاخص های عملکرد ایمنی – اقتصادی بر متوسط روزهای ازدست رفته کاری (مطالعه موردی در پروژه احداث پالایشگاه)*

Background and aims: According to the International Labour Organization, 17% of fatal accidents occur in construction projects and development Workshop. While this number in Iran according to the Labor Department is 46%. In developing Asian countries that are in the process of rapid industrialization occupational accidents is rising. Due to the economic difficulties caused by the sanctions and ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009