Unit Commitment is a fundamental problem in power systems engineering, deciding which generating units to switch on, and when to switch them on, in order to efficiently meet anticipated demand. It has traditionally been solved as a Mixed Integer Programming (MIP) problem but upcoming changes to the power system drastically increase the MIP solution time. In this paper, we discuss the benefits that using planning may have over the established methods. We provide a formal description of Unit Commitment, and we present its formulation as MIP and as a planning problem. This is a novel and interesting application area for planning, with features that make the domain challenging for current planners.
منابع مشابه
Solving Realistic Unit Commitment Problems Using Temporal Planning: Challenges and Solutions
When facing real world planning problems, standard planners are often inadequate and enhancement of the current techniques are required. In this paper we present the challenges that we have faced in solving the Unit Commitment (UC) problem, a well-known problem in the electrical power industry for which current best methods are based on Mixed Integer Programming (MIP). Typical UC instances invo...
متن کاملSolving Security Constrained Unit Commitment by Particle Swarm Optimization
The issue of unit commitment is one of the most important economic plans in power system. In modern and traditional power systems, in addition to being economical of the planning, the issue of security in unit operation is also of great importance. Hence power system operation confronts units’ participation and input considering network security constrains. The issue of units’ participation is ...
متن کاملAn adaptive modified firefly algorithm to unit commitment problem for large-scale power systems
Unit commitment (UC) problem tries to schedule output power of generation units to meet the system demand for the next several hours at minimum cost. UC adds a time dimension to the economic dispatch problem with the additional choice of turning generators to be on or off. In this paper, in order to improve both the exploitation and exploration abilities of the firefly algorithm (FA), a new mo...
متن کاملOperation Planning of Wind Farms with Pumped Storage Plants Based on Interval Type-2 Fuzzy Modeling of Uncertainties
The operation planning problem encounters several uncertainties in terms of the power system’s parameters such as load, operating reserve and wind power generation. The modeling of those uncertainties is an important issue in power system operation. The system operators can implement different approaches to manage these uncertainties such as stochastic and fuzzy methods. In this paper, new ...
متن کاملReliability-Constrained Unit Commitment Considering Interruptible Load Participation
From the optimization point of view, an optimum solution of the unit commitment problem with reliability constraints can be achieved when all constraints are simultaneously satisfied rather than sequentially or separately satisfying them. Therefore, the reliability constraints need to be appropriately formulated in terms of the conventional unit commitment variables. In this paper, the reli...