A supply chain model with defective items and disposal cost in a just-in-time (JIT) environment
نویسنده
چکیده
Previous studies in the issue of supply chain models with imperfect quality assumed the defectives could be sold at lower unit price by the end of the inspection process and the lot-for-lot delivery policy was employed. However, in practice, defective items may have no salvage value but may need additional disposal cost to process them. The beginning of the printed circuit board (PCB) industry in Taiwan provides a good example of such a situation. Besides, in a just-in-time (JIT) environment, the supplier splits the order quantity into small lot size and delivers them over multiple periods to response the buyer’s need. Therefore, in this paper, a new mathematical model were developed, in which defective items are processed with disposal cost and lot-splitting (single setup, multiple delivers) policy is employed, to determine an optimal single-suppliersingle-buyer inventory policy. The objective is to minimize the total joint annual cost incurred by the vendor and buyer in a JIT environment. A procedure free of employing convexity is developed to determine the order quantity, the number of deliveries and the shipping quantity. Numerical example was provided to illustrate the effectiveness of the proposed model. Based on the numerical example, sensitivity analysis was given to investigate the effects of the defective percentage on the optimal solution.
منابع مشابه
Enhancing Basic Metal Industry Global Competitiveness Through Total Quality Management, Supply Chain Management & Just- In -Time
The selection and implantation of sufficient and appropriate continuous improvement strategy are the key success factors for improving firm performance and enhancement of competitive advantage on manufacturing industries. As a result special role are given to Continuous improvement programs such as Supply Chain Management (SCM), Six-Sigma, Total Quality Management (TQM), Kaizen, Just-in-Time (J...
متن کاملAn Integrated Inventory Model with Controllable Lead time and Setup Cost Reduction for Defective and Non-Defective Items
In this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. The cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. Lead time is an important element in any inventory system. The proposed model is presents an integrated inventory model with controllable lead tim...
متن کاملFuzzy Queuing Approach for Designing Multi Supplier Systems (Case: SAPCO Company)
The importance of reliable supply is increasing with supply chain network extension and just-in-time (JIT) production. Just in time implications motivate manufacturers towards single sourcing, which often involves problems with unreliable suppliers. If a single and reliable vendor is not available, manufacturer can split the order among the vendors in order to simultaneously decrease the supp...
متن کاملSimulation based optimization of multi-product supply chain under a JIT system
It is scientifically challenging to determine the inventory level all through the supply chain in such a way that the desired objectives such as effectiveness and responsiveness of the supply chain system can be obtained. Simulation is a means for solving various problems which cannot be solved by regular exact models such as mathematical ones due to their complexity. The present paper is aime...
متن کاملطراحی یک سیستم کنترل فرآیند تولید برای زنجیره تامین چندمرحلهای و تکمحصولی
In a general sense, the main concept of Just-In-Time methodology is built on the concept of availability of an exact amount and type of commodity throughout a production line when it is really required. Under such circumstances, there is no need to situate any warehouse before any of the work station within the production plant. This method of manufacturing operations with the help of Kanban ...
متن کامل