A Collaborative Fuzzy-neural Approach for Internal Due Date Assignment in a Wafer Fabrication Plant

نویسندگان

  • Toly Chen
  • Yu-Cheng Lin
چکیده

Though many of the previous studies have been devoted to internal due date assignment in a wafer fabrication factory (wafer fab), very few among them considered the allowance added to a completion time forecast. In this way, the probability of on-time delivery is only about 50%. Methods based on confidence intervals generate completion time forecasts with very wide ranges and are not practical. From a novel viewpoint, Chen and Wang (2010) incorporated the hybrid fuzzy c-means and back propagation network (FCM-BPN) approach with a nonlinear programming (NP) model for the same purpose. The FCM-BPN-NP approach is modified in this study with some innovative treatments. At first, the BPNs of all categories are applied to predict the completion time of a job. After predicting the completion time, the inclusion interval can be derived with the NPs of all categories. Subsequently, a two-stage aggregation procedure is applied to measure the consensus among the inclusion intervals that are then aggregated in a collaborative way. Parameters in the BPN will be modified twice to determine the upper and lower bounds. Finally, the consensus is fed into another BPN for refining the completion time forecast. According to experimental results, the proposed methodology outperformed many existing approaches in reducing the average allowance. The advantage over the FCM-BPN-NP approach was up to 17%. In addition, the proposed methodology also guarantees that all jobs can be finished before the established internal due dates, without adding too large a fudge factor, and without sacrificing the accuracy of the completion/cycle time forecasts.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

A Fuzzy-neural Dbd Approach for Job Scheduling in a Wafer Fabrication Factory

Job scheduling is an important but difficult task to wafer fabrication factories. To further improve the performance of job scheduling in a wafer fabrication factory, a fuzzy-neural dynamic-bottleneck-detection (DBD) approach is proposed in this study. The fuzzy-neural DBD approach is modified from the traditional DBD approach after incorporating some major changes. First, taking into account t...

متن کامل

A Fuzzy-neural Approach Incorporating Exponentially Discounted Future Workload for Predicting Wafer Lot Output Time

Lot output time prediction is a critical task to a wafer fabrication plant (wafer fab). To enhance the effectiveness, a look-ahead FBPN incorporating the future release plan is constructed in this study. Three nearest exponentially discounted future workloads, modified from Chen’s nearest future discounted workloads, are proposed for the look-ahead function. According to experimental results, t...

متن کامل

A Fuzzy Collaborative Forecasting Approach for WIP Level Estimation in a Wafer Fabrication Factory

Forecasting the work-in-process (WIP) level is very important for the control of factory. However, the uncertainty in the WIP level is not easy to deal with. To solve this problem, a fuzzy collaborative forecasting approach is proposed. And also we show the effectiveness of the proposed methodology with a case study.

متن کامل

Wafer Lot Output Time Prediction with a Hybrid Artificial Neural Network

To further enhance the accuracy of lot output time prediction in a wafer fab (fabrication plant), a hybrid artificial neural network is proposed in this study. At first, the concept of input classification is applied to Chen’s fuzzy back propagation network (FBPN) by pre-classifying input examples with the self-organization map (SOM) classifier before they are fed into the FBPN. Then, examples ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011