An Automated Algorithm for Throughput Maximization Under Fixed Time Horizon in Multipurpose Batch Plants: S-Graph Approach

نویسندگان

  • Tibor Holczinger
  • Thokozani Majozi
  • Mate Hegyhati
  • Ferenc Friedler
چکیده

This paper presents a graph-theoretic technique for scheduling of multipurpose batch processes with the objective of maximizing throughput over a fixed time horizon. The presented technique is based on the S-graph framework which embeds the necessary scheduling information pertaining to recipes of different batches and possible resource allocation. The distinct feature of this contribution is the irrelevance of time horizon discretization which has become traditional in most mathematical programming techniques. Consequently, no presupposition of time points is required, thereby rendering the technique truly continuous in time. A comparison with time point based techniques is conducted to demonstrate the performance.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A hybrid MILP/CP decomposition approach for the continuous time scheduling of multipurpose batch plants

A hybrid Mixed-Integer Linear Programming (MILP)/Constraint Programming (CP) decomposition algorithm is proposed for the short-term scheduling of batch plants that rely on the State Task Network representation. The decisions about the type and number of tasks performed, as well as the assignment of units to tasks are made by the MILP master problem. The CP subproblem checks the feasibility of a...

متن کامل

A hybrid algorithm optimization approach for machine loading problem in flexible manufacturing system

The production planning problem of flexible manufacturing system (FMS) concerns with decisions that have to be made before an FMS begins to produce parts according to a given production plan during an upcoming planning horizon. The main aspect of production planning deals with machine loading problem in which selection of a subset of jobs to be manufactured and assignment of their operations to...

متن کامل

Retrieval–travel-time model for free-fall-flow-rack automated storage and retrieval system

Automated storage and retrieval systems (AS/RSs) are material handling systems that are frequently used in manufacturing and distribution centers. The modelling of the retrieval–travel time of an AS/RS (expected product delivery time) is practically important, because it allows us to evaluate and improve the system throughput. The free-fall-flow-rack AS/RS has emerged as a new technology for dr...

متن کامل

Heat integration of multipurpose batch plants using a continuous-time framework

Presented in this paper is a continuous-time mathematical formulation for optimization of heat integrated batch chemical plants. This formulation is applicable to both multipurpose and multiproduct facilities in which opportunities for direct heat integration exist. It is assumed that thermal driving forces and heat duties between operations identified as potential heat integration candidates a...

متن کامل

Minimization of Makespan with Discrete-Time State-Task Network Formulation

A novel algorithm is proposed for the minimization of makespan of multipurpose batch plants using the State Task Network formulation. The algorithm involves the solution of successive feasibility problems, where the time horizon is extended until a feasible schedule for the given demand is found. To exploit the tight LP relaxation of the STN formulation, a production maximization problem (subje...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007