The ASEMAR Project

نویسندگان

  • J. Le Gall
  • N. Mandelert
چکیده

Aware of the new trends in Surveillance Operations, THALES Underwater Systems has been developing AUV based sonar systems since the late 1990’s. At present, THALES and ECA are developing an AUV system, within the frame of the French Poles of Competitiveness (Pôle Mer Bretagne). This project is called ASEMAR, for “Auv de SEcurité MARitime”. In this development, THALES and ECA work together in a strong partnership, THALES being the System Design Authority and ECA being the expert in vehicle design. The objective is clearly to develop, experiment and industrialize an autonomous AUV based Surveillance System. The main components of the AUV are the embedded intelligence, the sonar payload, the navigation function and the vehicle. The AUV may communicate with the surface ship through an acoustic link; sonar and navigation data are recorded on board the AUV. To secure its main capabilities, the AUV takes benefit of efficient functions and sub-systems. For instance, THALES is developing a challenging on board processing that will perform automatic target recognition and determine adaptive behaviour as part of the mission management. The system is open and modular, which means that, as future growth potentials, it may include more efficient or additional functions or equipments. Academic partners are also involved in the project, to investigate new innovative functions to be integrated in the system. The presentation will give details about the functions and performance of the AUV and will give some results from sea trials.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-view fusion based on belief functions for Autonomous Underwater Vehicle

We present an approach of automatic seabed recognition from multiple views of side-scan sonar in the context of the project ASEMAR of the pole Mer Bretagne. We integrate detailed knowledge about each view: the nature of the seabed, the position and the uncertainty and the imprecision related to each information. To exploit information from multiple views, a fusion strategy for seabed recognitio...

متن کامل

A Systems Dynamics Model for Project Management systems of Project-Based Organization

It is obvious that the success of a project-based organization is dependent on its projects. A variety of tools such as the project excellence model, project management maturity models, the earned value method, have been developed in this regard, but there are still delays in projects because the projects have dynamic nature with non-linear relationships and feedback processes during the projec...

متن کامل

Identifying and evaluating individual factors of project manager contributing to project success in project-based organizations

In recent years, The importance key success factors  has led organizations to focus more on these factors. project management is one of the factors greatly affecting project success. Having a qualified and competent project manager is the first step to actual project success. In this study, the individual factors and important competencies of the project manager have been investigated. The sta...

متن کامل

Project Managers Competencies based on ICB and Project Management Processes based on PMBOK in Project Based Organization (Case study: Hydropower Plants Management)

Effective implementation of managerial systems needs software and hardware requirements. Project management competencies of the managers is one of the most important and inevitable requirements to ensure the success of the projects in any industry. Inorder to clarify the requirements, many international and professional instituts have presented well-known frameworks to help the managers to shap...

متن کامل

An Integrated Risk-Based Technique for Project Plan Selection

  Selecting an effective project plan is a significant area in the project management. The present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. The efficient frontier includes two criteria: the project cost and the project time. Besides, the paper presents a scheme to incorporate Directed Ac...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010