Drilling holes into concrete or metal ceilings is one of the most physically demanding tasks performed in construction. The work is done overhead with rotary impact hammer drills that weigh up to 40 N. The task is associated with pain and musculoskeletal disorders at the wrist, forearm, shoulder, and back. The mechanism of injury is thought to be the high forces and non-neutral shoulder and wrist postures applied during drilling. Previously, we described a field study of a foot lever and inverted drill press intervention devices that received poor usability ratings compared with the usual method for overhead drilling based on problems with mobility and productivity. Using a participatory intervention model, feedback from construction workers (N = 13) was used to develop a new intervention design that incorporated a wheeled tripod base and a unique method of aligning the drilling column to vertical. A different group of construction workers (N = 23) evaluated usability and fatigue of the new device during their regular overhead drilling in comparison with the usual method. Four of 12 usability ratings were significantly better with the intervention device compared with the usual method. Subjective shoulder fatigue was less with the new intervention (1.1 vs. 3.3; scale 0 to 5; p < 0.001). This difference was supported by objective outcome measures; the mean hand forces during drilling were 26 N with the intervention compared with 245 N with the usual method. The percentage of time with the shoulder flexed or abducted to more than 60 degrees was less with the intervention compared with the usual method (21 vs. 40%; p = 0.007). There was significantly less head extension with the intervention compared with the usual method. There were no significant differences in overall productivity between the two methods. This study demonstrates that a new intervention device for overhead drilling has improved usability and subjective fatigue ratings compared with the usual method. These improvements are most likely due to the reduced hand forces, reduced shoulder abduction and flexion, and reduced drilling time.
منابع مشابه
Blast Design for Improved Productivity using a Modified Available Energy Method
In this work, a new drilling and blasting design methodology is introduced and applied at a case study mine to improve productivity. For the case study copper mine, a blast diameter of 203 mm is proposed to be used in the ore zone to meet the new required production rate of 90mtpa from 75mtpa. Currently, the Konya and Walter’s model is used to generate drilling and blasting design at a bl...
متن کاملDevelopments Made in the Field of Drilling Fluids by Saint Petersburg Mining University
The article discusses researches performed in the Well Drilling Department of the St. Petersburg Mining University. The directions of development of the department are shown. Special attention in this article is paid to research in the field of developing drilling fluids for drilling wells in various mining and geological conditions. It is shown that the gas-liquid mixtures studied by the depar...
متن کاملIdentification and ranking risks of horizontal directional drilling for oil & gas wells by using fuzzy analytic network process, a case study for Gachsaran oil field wells
Risk ranking of Horizontal Directional Drilling (HDD) for gas and oil wells is a key criterion in the project feasibility, pricing and for introducing a risk management strategy that aims to reduce the number of failures in the installation phase and its negative consequences. HDD is currently widely used in drilling wells in Iran, but research in the area of identification and risks ranking of...
متن کاملStudying empirical correlation between drilling specific energy and geo-mechanical parameters in an oil field in SW Iran
Multiplicity of the effective factors in drilling reflects the complexity of the interaction between rock mass and drilling bit, which is followed by the dependence of parameters and non-linear relationships between them. Rock mass or, in other words, the formation intended for drilling, as the drilling environment, plays a very essential role in the drilling speed, depreciation of drilling bit...
متن کاملA SIMULATION OF MANAGED PRESSURE DRILLING IN IRANIAN DARQUAIN OIL FIELD
The narrow operating window between pore pressure and fracture pressure makes drilling difficult in some operations. A feasibility study of managed pressure drilling (MPD) is carried out on Iran Darquain oil field. The previous wells drilled in this field showed that mud returns were lost during drilling Gadvan formation. The present work addresses this problem by means of surface back pressure...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Journal of occupational and environmental hygiene
دوره 7 4 شماره
صفحات -
تاریخ انتشار 2010