A Simple Heuristic for Joint Inventory and Pricing Models with Lead Time and Backorders

نویسندگان

  • Fernando Bernstein
  • Yang Li
  • Kevin Shang
چکیده

We study a joint inventory and pricing problem in a single-stage system with a positive lead time. We consider both additive and multiplicative demand forms. This problem is, in general, intractable due to its computational complexity. We develop a simple heuristic that resolves this issue. The heuristic involves a myopic pricing policy that generates each period’s price as a function of the initial inventory level and a base-stock policy for inventory replenishment. In each period, the firm monitors its so-called price-deflated inventory position and places an order to reach a target base-stock level. The price-deflated inventory position weights the on-hand and pipeline inventory according to a factor that reflects the sensitivity of price to the net inventory level. To assess the effectiveness of our heuristic, we construct an upper bound to the exact system. The upper bound is based on an information-relaxation approach and involves a penalty function derived from the proposed heuristic. A numerical study suggests that the heuristic is near-optimal.The heuristic approach can be applied to a wide variety of inventory systems, such as systems with fixed ordering costs or fixed batch sizes. The heuristic enables us to explore the use of price as a lever to balance supply and demand. Our findings indicate that a responsive strategy (that effectively reduces the replenishment lead time) leads to a more stable pricing policy and that the value of dynamic pricing increases with lead time.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Joint pricing, inventory, and preservation decisions for deteriorating items with stochastic demand and promotional efforts

This study models a joint pricing, inventory, and preservation decision-making problem for deteriorating items subject to stochastic demand and promotional effort. The generalized price-dependent stochastic demand, time proportional deterioration, and partial backlogging rates are used to model the inventory system. The objective is to find the optimal pricing, replenishment, and preservation t...

متن کامل

A Simple Heuristic for Joint Inventory and Pricing Problems with Lead Time

We study a joint inventory and pricing problem in a single-stage system with a positive lead time. We consider both additive and multiplicative demand forms. This problem is, in general, intractable due to its computational complexity. We develop a simple heuristic that resolves this issue. The heuristic involves a myopic pricing policy that generates each period’s price as a function of the in...

متن کامل

A multiple objective approach for joint ordering and pricing planning problem with stochastic lead times

The integration of marketing and demand with logistics and inventories (supply side of companies) may cause multiple improvements; it can revolutionize the management of the revenue of rental companies, hotels, and airlines. In this paper, we develop a multi-objective pricing-inventory model for a retailer. Maximizing the retailer's profit and the service level are the objectives, and shorta...

متن کامل

Joint Pricing and Inventory Control for Seasonal and Substitutable Goods Mentioning the Symmetrical and Asymmetrical Substitution

Nowadays many well-known firms may produce similar products at different prices in order to remain in the competitive environment. The price differences may cause substitution condition which motivates the customers to substitute the similar cheaper product with an expensive one leading to an environment which is known as “customer-based price driven substitution”. This research proposes a new ...

متن کامل

Optimal (R, Q) policy and pricing for two-echelon supply chain with lead time and retailer’s service-level incomplete information

Many studies focus on inventory systems to analyze different real-world situations. This paper considers a two-echelon supply chain that includes one warehouse and one retailer with stochastic demand and an up-to-level policy. The retailer’s lead time includes the transportation time from the warehouse to the retailer that is unknown to the retailer. On the other hand, the warehouse is unaware ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Management Science

دوره 62  شماره 

صفحات  -

تاریخ انتشار 2016