Geographic Information Systems in Evaluation and Visualization of Construction Schedule

نویسندگان

  • V. K. Bansal
  • Mahesh Pal
چکیده

Commercially available scheduling tools such as Primavera and Microsoft Project fail to provide information pertaining to the spatial aspects of construction project. A methodology using geographical information systems (GIS) is developed to represent spatial aspects of the construction progress graphically by synchronizing it with construction schedule. The spatial aspects are depicted by 3D model developed in AutoCAD and construction schedule is generated using Microsoft Excel. Spatial and scheduling information are linked together into the GIS environment (ArcGIS). The GIS-based system developed in this study may help in better understanding the schedule along with its spatial aspects.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Potential of GIS to Find Solutions to Space Related Problems in Construction Industry

Geographic Information System (GIS) is a computerbased tool used extensively to solve various engineering problems related to spatial data. In spite of growing popularity of GIS, its complete potential to construction industry has not been realized. In this paper, the summary of up-to-date work on spatial applications of GIS technologies in construction industry is presented. GIS technologies h...

متن کامل

Developing a conceptual model based upon the Latin Hypercube Sampling for integrating OHS into project risk evaluation

Abstract Project management in construction industry, in many cases, is imperfect with respect to the integration of Occupational Health and Safety (OHS) risks. This imperfection exhibits itself as complications affecting the riskiness of industrial procedures and is illustrated usually by poor awareness of OHS within project teams. Difficulties on OHS regularly came about in the construction i...

متن کامل

Construction schedule review in GIS with a navigable 3D animation of project activities

This paper presents a Geographic Information Systems (GIS) based navigable 3D animation of project activities to visualise and review a construction project schedule as an alternative to the existing 4D CAD tools. Most of the commercial tools allow planners to build a 4D model but lack features like generation and manipulation of developed 4D model on a single platform. To facilitate the 4D mod...

متن کامل

Water Quality Evaluation of Bamdezh Wetland Using Combination of NSFWQI and Geographic Information System

Bamdezh wetland with the geographical coordinates of   north longitude, east latitude and an area of 44 square Kilometers, is located in about 40 km northwest of Ahvaz and Shavur River is the main source of its supply. This wetland is not only a habitat and suitable food source for aquatic and migratory birds, but as well a significant resource of income for the locals. Today, with the arrival ...

متن کامل

Water Quality Evaluation of Bamdezh Wetland Using Combination of NSFWQI and Geographic Information System

Bamdezh wetland with the geographical coordinates of   north longitude, east latitude and an area of 44 square Kilometers, is located in about 40 km northwest of Ahvaz and Shavur River is the main source of its supply. This wetland is not only a habitat and suitable food source for aquatic and migratory birds, but as well a significant resource of income for the locals. Today, with the arrival ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • CoRR

دوره abs/0803.3515  شماره 

صفحات  -

تاریخ انتشار 2008